Installation Guide, Sixth Edition - HP Integrity rx8620 Server
Chapter 2
Installation
Cabling and Power Up
78
The preferred tool is the CE Tool running Reflection 1.
To power on the MP, set up a communications link, and log in to the MP:
1. Apply power to the server cabinet.
Apply power to any other server cabinets that were shipped to the customer site.
On the front of the server, a solid green Standby Power, and a solid green MP Present light will
illuminate after about 30 seconds.
Figure 2-30 Front Panel Display
2. Check the bulk power supply (BPS) LED for each BPS. See Figure 2-31 for the LED location.
When on, the breakers distribute power to the BPS. AC power is present at the BPS:
• When power is first applied. Note the BPS LEDs will be flashing amber.
• After 30 seconds have elapsed. Note the flashing amber BPS LED for each BPS becomes a flashing
green LED.
RUN
Fault
Attention Remote
MP Present
Standby Power
Power
Power
Switch