HP Integrity rx8640 and HP 9000 rp8440 Servers Installation Guide

Table 15 Factory-Integrated Installation Checklist
CompletedIn-processProcedure
CommentsInitialsCommentsInitials
Obtain LAN information
Verify site preparation
Site grounding verified
Power requirements verified
Check inventory
Inspect shipping containers for
damage
Unpack cabinet
Allow proper clearance
Cut polystrap bands
Remove cardboard top cap
Remove corrugated wrap
from the pallet
Remove four bolts holding
down the ramps and remove
the ramps
Remove antistatic bag
Check for damage (exterior
and interior)
Position ramps
Roll cabinet off ramp
Unpack the peripheral cabinet (if
ordered)
Unpack other equipment
Remove and dispose of packaging
material
Move cabinet and equipment to
computer room
Move cabinet into final position
Position cabinet next to each
other (approx. 1/2 inch)
Adjust leveling feet
Install anti tip plates
Inspect cables for proper
installation
Set up CE tool and connect to
Remote RS-232 port on MP
Apply power to cabinet
(Housekeeping)
Check power to BPSs
Cabling and Powering On the Server 71