HP Integrity rx8640, HP 9000 rp8440 Server User Service Guide
Table 24 Factory-Integrated Installation Checklist (continued)
CompletedIn-processProcedure
Log in to MP
Set LAN IP address on MP
Connect customer console
Set up network on customer
console
Verify LAN connection
Verify presence of cells
Power on cabinet (48 V)
Verify system configuration and
set boot parameters
Set automatic system restart
Boot partitions
Configure remote login (if
required).
Verify remote link (if required).
Install non-factory, integrated I/O
cards (if required)
Select PCI card slot
Install PCI card
Verify installation
Route cables using the cable
management arm
Install other peripherals (if
required)
Perform visual inspection and
complete installation
Set up network services (if
required)
Enable Instant Capacity (if
available)
Final inspection of circuit boards
Final inspection of cabling
Area cleaned and debris and
packing materials disposed of
Tools accounted for
Parts and other items disposed of
Make entry in Gold Book
(recommended)
Customer acceptance and signoff
(if required)
80 Installing the System