HP Modular Cooling System Site Preparation Guide

Before Installing/Running Active Components…
Prior to starting up any active components (servers, storage devices, etc.) mounted in the HP MCS
rack unit, the following steps must be performed.
Ensure that the chilled water source is on and flowing prior to the start-up of an HP MCS unit.
Make sure the HP MCS is fully operational and running before turning on the servers and closing
the front/rear cabinet doors.
CAUTION:
If the HP MCS unit is left running in manual mode for a
period of time without an adequate heat load being
generated by servers or other computing/networking
devices, excess condensation could occur within the
cabinet or system.
For more information on the installation of the HP MCS, refer to the HP MCS documentation
available at the following URL:
(
http://h20000.www2.hp.com/bizsupport/TechSupport/DocumentIndex.jsp?contentType=Support
Manual&lang=en&cc=us&docIndexId=179111&taskId=101&prodTypeId=329290&prodSeriesId=
1155256 ).
HP MCS Site Preparation Guide
47