HP Netserver E 60, LC 3, LH 3/3r, and LPr Processor Upgrade Guide

Chapter 3 Installation in LC 3 and LH 3/3r
12
Table 3-1 summarizes differences among the operations required for various
types of upgrades. It also lists the section in this chapter that describes each
operation.
Table 3-1. Upgrade Operations for HP NetServer LC 3 and LH 3/3r
Upgrade to Dual (No Change in Speed)
LC 3 LH 3/3r Described in
Remove terminator
board
Remove terminator board "Removing the Terminator
Board"
Add processor module Add processor module "Installing Processor
Modules"
Add VRM Add VRM "Installing a VRM "
Set system switches Set system switches "Setting System Switches"
Upgrade to New Speed (No Change in Number of Processors)
LC 3 LH 3/3r Described in
Remove existing
processor module(s)
Remove existing processor
module(s)
"Removing the Existing
Processor Module"
Install processor
module(s)
Install processor module(s) "Installing Processor
Modules"
Set system switches Set system switches "Setting System Switches"
Upgrade to Dual at New Speed
LC 3 LH 3/3r Described in
Remove terminator
board
Remove terminator board "Removing the Terminator
Board"
Remove existing
processor module
Remove existing processor
module
"Removing the Existing
Processor Module"
Install processor
modules
Install processor modules "Installing Processor
Modules"
Add VRM Add VRM "Installing a VRM"
Set system switches Set system switches "Setting System Switches"