HP Netserver LPr Installation Guide

Chapter 9 Mounting the Server in the Rack
72
Step 8: Fasten the LPr to the front columns.
Make sure that the mounting holes in the chassis’ front flanges line
up with the rack nuts you mounted on the rack’s front columns. They
will be the nuts in holes 2 and 5 counting up from the bottom of the
EIA unit.
Finger-tighten four T25 Torx screws, two in each front column,
through the flanges into the rack nuts.
Figure 9-12. Finger-Tighten the Chassis to the Front Columns