5190/5194 Modular Tape Subsystem Manual
Installing the Modular Tape Subsystem
5190/5194 Modular Tape Subsystem Manual—426878-002
3-32
Connecting a SCSI Cable
7. Bring each module online. See Bringing the Tape Drives Online After Installation
on page 3-39.
8. Reinstall the rear bezel door for each module, making sure that any AC power
cords or cables are routed properly through the door cutouts and into the extrusion
channels on the sides of the module.
Connecting a NonStop Himalaya S-Series SCSI Cable to the
Drive CRU
At the rear of each tape drive CRU, there are two 50-pin SCSI ports. SCSI cable links
one of these ports with a PMF CRU or IOMF CRU. A SCSI terminator covers the other
port (see Figure 3-19).
Connect the SCSI cable to the SCSI port on the tape drive CRU as follows:
1. Find the SCSI cable. The cable is packaged in a separate box when your system
is delivered.
2. Align the 50-pin SCSI cable connector, which has latch-clip flanges, with the
uncapped SCSI port on the right as you face the rear of the drive CRU.
3. Attach the 50-pin SCSI cable connector to the SCSI port and latch the connector
clips.
Figure 3-18. Routing SCSI Cable Into the Extrusion Channel
Hinge
Mount
Tie
Wrap
SCSI
Cable
Extrusion
Guides
VST021.vsd