9710 (StorageTek) Addendum for NonStop Servers
Addendum to the StorageTek 9710 for the Tandem Environment 
Installing and Configuring the 9710 Automated Cartridge Subsystem
3-27
 CAUTION 
Make sure that none of the fiber-optic cables become pinched during 
installation. Fiber-optic cable should not be bent more than the maximum 
bend radius of 10 centimeters (4 inches). 
6. Repeat Steps 1 through 5 for each drive FRU that uses fiber-
optic cables. 
7. After all of the fiber-optic cables have been installed into all of 
the BEB modules, reinstall the external panel of the 9710 Tape 
Subsystem.  
Note: Installing the fiber-optic cable(s) behind the external panel 
prevents the cable(s) and BEB(s) from becoming damaged.  










