9710 (StorageTek) Addendum for NonStop Servers
Addendum to the StorageTek 9710 for the Tandem Environment 
Table of Contents  
ii
Chapter 3: Installing and Configuring the 9710 Automated  
  Cartridge Subsystem...................................................... 3-1 
 3.1 In This Chapter........................................................................ 3-1 
 3.2 Installation Overview............................................................... 3-1 
 3.3 Before Starting ........................................................................ 3-2 
 3.4 Site Setup................................................................................ 3-2 
 3.5 Site Guidelines......................................................................... 3-2 
3.6 Installing the 5155/5159 DLT Tape Drive CRU(s) in the  
 9710 ACS................................................................................ 3-5 
3.7 Configuring the 9710 Automated Cartridge Subsystem ............ 3-6 
 3.8 Configuration Guidelines ......................................................... 3-6 
 3.9 Changing the SCSI ID ............................................................. 3-6 
 3.10 Connect the Cables ................................................................ 3-7 
 3.11 Drive Placement and the SCSI ID .......................................... 3-9 
 3.12 Drive Configuration............................................................. 3-11 
 3.13 Patch Panel Connections...................................................... 3-14 
 3.14 Opening and Removing the Side Door ................................. 3-16 
 3.15 Installing the BEB (3216) ................................................... 3-18 
 3.16 Connecting and Routing the Power Cords............................ 3-20 
 3.17 Connecting Copper Cable to the MFC RS-232/SCSI BIC.... 3-21 










