ATM Adapter Installation and Support Guide

Replacing an ATM3SA Adapter
ATM Adapter Installation and Support Guide420013-002
3-24
Verify that the Communications Lines are Restarted
2. To start the WAN subsystem input/output processes (IOPs), use the SCF START
DEVICE command:
START DEVICE $ZZWAN.#device-name
3. To start the lines:
To start a single line, use the SCF START LINE command:
START LINE $line-name.
To start all the lines in an Expand multiline path, use the SCF START PATH
command :
START PATH $path-name
Verify that the Communications Lines are Restarted
Verify that communications lines using an ATM3SA adapter are started:
1. To verify that the TCP/IP subnets are started, use the SCF STATUS SUBNET
command:
STATUS SUBNET $tcpip-process-name.#subnet-name
Example 3-13 shows the output of this command.
Note that the subnet is in the STARTED state.
2. To verify that the WAN subsystem input/output processes (IOPs) are started, use
the SCF STATUS DEVICE command:
STATUS DEVICE $ZZWAN.#device-name
Example 3-14 shows the output of this command.
Note that the WAN subsystem input/output process (IOP) is in the STARTED state.
3. To verify that the lines are started:
Example 3-13. SCF STATUS SUBNET Command
->STATUS SUBNET $ZTC01.#SN2
TCPIP Status SUBNET \COWBOY.$ZTC01.#SN2
Name Status
#SN2 STARTED
Example 3-14. SCF STATUS DEVICE Command
->STATUS DEVICE $ZZWAN.#LINE1
WAN Manager STATUS DEVICE for DEVICE \COWBOY.$ZZWAN.#LINE1
State :........ STOPPED
LDEV number.... 110
PPIN........... 2 ,13 BPIN......... 3 ,14