ATM Configuration and Management Manual

Configuring the ATM Subsystem
ATM Configuration and Management Manual522307-003
3-2
Configuration Forms
6. Check that the $ZNET subsystem manager process is started.
$ZNET configures the SCP management process.
7. Check that the QIO subsystem is started.
QIO is preconfigured and started during the system-load sequence as a generic
process. Generic processes are part of the SCF Kernel subsystem ($ZZKRN). For
more information about generic processes, see the
SCF Reference Manual for the
Kernel Subsystem
.
QIO subsystem configuration is described in the
QIO Configuration and
Management Manual
.
8. Check that the TSM or OSM processes are running.
For more information, see the TSM or OSM manuals and online help.
Configuration Forms
Before you configure the ATM subsystem, you need to complete a configuration form
for each ATM3SA adapter as described in the
NonStop S-Series Planning and
Configuration Guide
. You need the information on the configuration form for your
configuration. Figure 3-1 on page 3-3 shows a sample completed ATM3SA
Configuration Form.
For each ATM3SA:
Enter the name of the system in the System Name field.
Enter the group number for this enclosure in the Group Number field.
Enter the slot number of this ATM3SA in the Slot Number field. ATM3SAs can be
installed in slots 53 and 54.
Because there is one module in a system enclosure, the module number 1, is
already indicated on the form.
Complete the ATM port information block for each port on the adapter.
°
Enter the ATM address to be assigned to the port in the ATM address field.
The address is the one used by the third-party switch connected to this
particular ATM adapter.
Optionally, to save time and effort, you can leave this address blank and allow
the ILMI feature to perform automatic address registration.
°
Enter the adapter name.
°
Enter the line name.
°
Enter the numbers of the processors that will have access to the Access List
field.
When you complete this form, enter todays date in the Date field.