Availability Guide for Change Management
Change Control
Availability Guide for Change Management–125506
2-5
Phase 1—Definition and Documentation
Figure 2-1. Planned Outage Request Form
CDT 001
Planned Outage Request Form
REQUESTED BY
DATE REQUEST FORM SUBMITTED
DATE OF OUTAGE
TRACKING NUMBER
Maximum
(Minutes)
60
Requested
(Minutes)
Actual
(Minutes)
30
60
Application/system shutdown
Downtime work (move files, add
hardware, SQL compiles, etc.)
System load
System and subsystem startup
Application startup
cold start
warm start
Test application before
turning over to production
30
30
30
BRIEFLY DESCRIBE THE REASON FOR THE OUTAGE:
LIST APPLICATIONS THAT ARE AFFECTED:
LIST HARDWARE DEVICES THAT ARE AFFECTED:
IF THE PLANNED OUTAGE INVOLVES A COMPLEX CHANGE, DESCRIBE THE FALLBACK AND BACKOUT PROCEDURES.
INCLUDE STRICT "GO/ NO GO" CRITIERIA: