Backup and Restore 2 Manual
Installing Backup and Restore 2
Backup and Restore 2 Manual—522696-019
2-3
Required SPRs—G-Series RVUs
T2749AAF (BR 2 DMA & Cmd Stream Proc)
T2750AAF (BR 2 Data Services)
The AAF SPRs include these fixes:
During the restore of a backup job operation produced by a parallel backup job, the
backup and restore job operation requests the alternate tape if the first tape is not
available or the mount request for it is rejected by the user.
Backup and Restore 2 creates an alternate target for the restore job.
BRCOM no longer accepts the commands with invalid syntax for these scenarios:
The RESTORE TARGET spec is not enclosed in parenthesis.
Unbalanced parenthesis in the command.
The backup job no longer abends when a backup is performed on a file that is
being updated.
FFDC no longer triggers under these conditions:
The primary processor of the alternate EMS collector goes down.
The alternate EMS collector is stopped.
The alternate EMS collector abends.
The Data Service process no longer receives an incorrect close EMS message -
104 when the Tape Service process is stopped.
The backup or restore operation can be a waited operation if the new job option,
WAITED, is specified in the command syntax.
The Data Service and Tape Service processes no longer crash when a backup or
restore operation is performed using the INV run option.
Stack corruption no longer occurs when the RLSEID file does not exist on a
system.
A syntax error is returned if a duplicate TARGET or TGT keyword is specified in a
RESTORE command.
For more information about the AAF SPRs, see the softdocs.
Backup and Restore 2 AAG SPRs
The G06.28 RVU includes these AAG SPRs that are required to backup or restore
both OSS and SQL/MX objects:
T2721AAG (BR 2 BRCOM)
T2722AAG (BR 2 Tape Services)
T2749AAG (BR 2 DMA & Cmd Stream Proc)
T2750AAG (BR 2 Data Services)