Ethernet Adapter Installation and Support Guide

Replacing an E4SA
Ethernet Adapter Installation and Support Guide425684-003
3-36
Verify that the Communications Lines are Restarted
1. Verify that the TCP/IP subnets are started.
Use the SCF STATUS SUBNET command:
STATUS SUBNET $tcpip-process-name.#subnet-name
Example 3-29 shows the output of this command. Note that the subnet (#SN2)
is in the STARTED state.
2. Verify that the IPXPROTO process is started.
Use the SCF STATUS PROCESS command.
STATUS PROCESS $line-name
Example 3-30 shows the output of this command. Note that the IPXPROTO
process ($ZNV2) is in the STARTED state.
3. Verify that a Port Access Method (PAM) line is started.
Use the SCF STATUS LINE command:
STATUS LINE $line-name
Example 3-31 shows the output of this command. Note that the Port Access
Method (PAM) line ($TOK1) is in the STARTED state.
Note. To verify TCP/IP subnets that are configured using Parallel Library TCP/IP, refer to the
TCP/IP (Parallel Library) Configuration and Management Manual. To verify TCP/IP subnets
that are configured using NonStop TCP/IPv6, refer to the TCP/IPv6 Configuration and
Management Manual.
Example 3-29. SCF STATUS SUBNET Command
->STATUS SUBNET $ZTC01.#SN2
TCPIP Status SUBNET \COWBOY.$ZTC01.#SN2
Name Status
#SN2 STARTED
Example 3-30. SCF STATUS PROCESS Command
->STATUS PROCESS $ZNV2
IPXSPX Status PROCESS
Process Name State Diagnostic State Trace
$ZNV2 STARTED NORMAL OFF
Example 3-31. SCF STATUS LINE Command
->STATUS LINE $TOK1
Primary Backup
Name State CPU PIN CPU PIN Trace
$TOK1 STARTED 1 278 -1 -1 OFF