Fibre Channel ServerNet Adapter Installation and Support Guide (G06.28+, H06.06+, J06.03+)
Connect External Paths
To complete this task, coordinate with the FC switch administrator (if you are connecting to the
ESS through an FC switch) and with the ESS administrator. Provide them with the FCSA to ESS
connection form as shown in Figure 2-4 and ask them to:
1. Have the FCSA connected to the FC switch or ESS (depending on whether you are using
direct connect or switched connect).
CAUTION: Do not connect the fibre channel cables to the FC switch or the ESS yourself.
The ESS or FC switch administrator must perform this task.
2. Update the WWN zoning in the SAN so the ESS recognizes the FCSA.
NOTE: Adding or updating WWNs in the ESS is not required if the FCSA ports are directly
connected to the ESS FC ports.
3. Add WWNs to the ESS host group configurations as appropriate.
4. Start the disk again. (You can expect it to start this time.)
NOTE: You might need to reset the disk before the subsystem accepts the START command.
Disk Configuration (FCDM Connection)
For information about disk configuration for FCDMs containing M8xxx disks, see the SCF
Reference Manual for the Storage Subsystem.
Verify the Disk Configuration
To check that the DISK object was successfully added to the configuration database, issue the
SCF STATUS ADAPTER adapter-name, DETAIL command.
STORAGE - Detailed Status ADAPTER \IO.$ZZSTO.#FCSA.GRP-11.MOD-2.SLOT-1
Adapter Type..... FCSA
Flash Boot....... T0612G06 Flash Update Active.... Done
Flash Firmware... T0630G06 Flash Update Result.... Init
Location......... (11,2,1) Number of SACs......... 2
Part ID.......... 526217-001 POST Result............ PASSED
Power-1.......... ON Power-2................ ON
Revision Level... A01-01 Status................. PRESENT
Tracking Number.. MP0008 Vendor ID..............
ServerNet Addressable Controllers:
SAC \IO.$ZZSTO.#FCSA.SAC-1.GRP-11.MOD-2.SLOT-1:
SAC Number..... 1 Firmware.......... T0630G06
POST Result.... PASSED SAC SCSI ID.......
SAC Type....... FC Side.............. Both
Status......... PRESENT
Connection..... F port Node Name......... 20060B00001CE5F8
Port Id........ 65792 Port Name......... 50060B00001CE5F8
SAC State...... Ready SAC Subtype....... 1
Configured Devices ( group: 11, module: 2 ):
Slot Name State Substate Primary Backup
PID PID
1 $PT00-B STARTED 2,272 3,264
44 Installing an FCSA