G06.26 Software Installation and Upgrade Guide
G06.26 Upgrade Checklists
G06.26 Software Installation and Upgrade Guide—529886-002
2-2
G06.26 Upgrade Checklist
8. Install and configure TSM
or OSM SPRs
(optional)**
40
minutes***
See the OSM Migration Guide and
TSM softdocs.
9. Create G06.26 software
configuration revision
1 minute Create a New Software Revision
on page 5-8
10. Build and apply G06.26
software revision
2 hours with
OSS files
Build and Apply the New Software
Revision on page 5-13
11. Print the DSM/SCM
Operator Instructions
<1 minute Print Operator Instructions From
the Target Interface (ZPHITI) on
page 5-18
12. Replace the disk
bootstrap program (if
necessary)
<1 minute Section 6, Replacing the Disk
Bootstrap Microcode (Pre-G06.06)
13. Update service
processor (SP) firmware
(if necessary)
9 minutes
per SP
Section 7, Updating Service
Processor (SP) Firmware
14. Update processor boot
code (if necessary)
0.0
minutes
**
Section 8, Updating Processor
Boot Code
15. Run ZPHIRNM 12 minutes Running ZPHIRNM on page 10-1
16. Halt processors 4 minutes Halt the Processors on page 11-2
17. Load the system with the
G06.26 RVU
10 minutes System Load Using the TSM or
OSM Low-Level Link on page 11-4
18. Update SCSI boot code
(if necessary)
1 minute per
controller
Section 9, Updating SCSI Boot
Code (Pre-G06.08 RVU)
19. Recover the TCP/IP files
(if necessary)
2 minutes Update TCP/IP Configuration
Files on page 12-1
20. Reconfigure TSM or
OSM ND applications (if
necessary)
0.0
minutes
***
Reconfigure System Console
Applications on page 12-4
21. Check processor status <1 minute Check Processor Status (Using
TSM or OSM) on page 12-4
22. Configure WANMGR (if
necessary)
20 minutes Upgrade the WAN Manager
(T8365), (Optional) on page 12-16
23. Update SWAN
concentrator CLIP
firmware (if necessary)
4 minutes
per SWAN
concentrator
Appendix C, Updating SWAN
Concentrator CLIP Firmware
24. Update ServerNet/FX
firmware (if necessary)
3 minutes
per adapter
Update ServerNet/FX and
ServerNet/FX2 Firmware on
page 12-6
Table 2-1. G06.26 Upgrade Checklist (page2of3)
Task Description
Minimum
Duration Documentation Done?