G06.26 Software Installation and Upgrade Guide

G06.26 Upgrade Checklists
G06.26 Software Installation and Upgrade Guide529886-002
2-3
G06.26 Upgrade Checklist
25. Configure the Spooler (if
necessary)
2 minutes Configure the Spooler on
page 12-9
26. Start system and
application software
11 minutes Start User and System
Applications on page 12-10
27. Reset and start the
system mirror disk (if
necessary)
2 minutes
(not
including the
REVIVE)
Reset and Start the Mirror System
Disk (If Necessary) on page 12-11
28. Configure OSS (if
necessary)
20
minutes
****
Configure OSS on page 12-13
29. Configure SMF (if
necessary)
60 minutes Configure SMF (Optional)
on
page 12-15
30. Configure RDF (if
necessary)
5 minutes Configure the Remote Duplicate
Database Facility (RDF) on
page 12-15
31. Install, and configure
OSM client-based
components and server if
not done in Step 8.
20
minutes***
See the OSM Migration Guide and
Support Note S03133B.
* Duration depends on the SPRs (if any) you need to install.
**Duration depends on selected TSM or OSM installation and configuration options.
***Duration of each remaining task depends on what products are installed on your system.
*
**
***
****
Table 2-1. G06.26 Upgrade Checklist (page3of3)
Task Description
Minimum
Duration Documentation Done?