G06.30 Software Installation and Upgrade Guide

G06.30 Software Installation and Upgrade Guide543764-002
2-1
2 G06.30 Upgrade Checklists
Use the checklist in Table 2-1 as you perform the tasks required to upgrade to the
G06.30 RVU and the checklist in Table 2-2 to record the information needed when
performing these tasks.
Task durations are included in Table 2-1. Most of these baseline durations were
established on an NonStop S72002 server running the G06.12 RVU under minimal
load (one user).
Note that these durations generally do not include operations such as starting a TSM
Service application or performing a System Discovery in the TSM Low-Level Link
Application or OSM Low-Level Link.
If you use DSM/SCM to manage OSS files, the Build/Apply operation is longer (about
an hour), depending on OSS products installed. If you select the Receive All files
option in DSM/SCM, the Build/Apply is also about an hour more.
G06.30 Upgrade Checklist
Table 2-1. G06.30 Upgrade Checklist (page1of3)
Task Description
Minimum
Duration Documentation Done?
1. Install the latest
DSM/SCM SPR, SWID.
(Optional) FUP DUP the
FALLBACK macro from
the DSM/SCM Archive.
40 minutes Appendix B, Installing the Latest
DSM/SCM SPRs and Client
Software
2. Install the DSM/SCM
client version
5 minutes Install the DSM/SCM Client From
ZDSMSCM on page B-13
3. Install required or
recommended fallback or
interoperability SPRs (if
necessary)
0.0
minutes
*
Section 3, Installing SPRs Before
Upgrading to the G06.30 RVU
Appendix A, Using DSM/SCM to
Install SPRs
4. Save current system
configuration file
<1 minute Save the Current Configuration
File (CONFxxyy) on page 4-1
5. Upgrade system console
software
60 to 90
minutes
Upgrade the System Console
Software on page 4-2
6. Verify system operations 15 minutes Verify System Operations
on
page 4-3
7. Check products that
might experience
regressions during the
upgrade
5 minutes Use VPROC to check specific
products, as described under
Check Products With Possible
Regressions on page 4-16