G06.31 Software Installation and Upgrade Guide

Installing the G06.31 RVU
G06.31 Software Installation and Upgrade Guide544626-002
6-8
Create a New Software Revision
Create a New Software Revision
When you create a new software revision, DSM/SCM selects the products in the SUT
that are licensed for your site and replaces any previous versions of the products.
The following steps assume that you are creating a new software revision that
manages OSS files. If you are not, go to Step 3 after you open the Planner Interface
Configuration Revisions dialog box. These instructions also assume that you have
installed OSS. To configure OSS for the first time, see the
Open System Services
Installation Guide
. For details on modifying a DSM/SCM target, see the
DSM/SCM
Users Guide
.
1. Check that the OSS root name server $ZPNS is running on the Target. The volume
where the SYS
nn
is being placed must be activated as $SYSTEM to install OSS
files. To determine the server process, enter an SCF STATUS SERVER command
or an SCF LISTDEV command. An example of the STATUS SERVER command is:
TACL>SCF STATUS SERVER $ZPMON.*
SCF - T9082G02 - (30APR03) (29JAN03) - 04/04/2003 14:39:49 System \TINY
Copyright Compaq Computer Corporation 1986 - 2003
OSS Status SERVER \TINY.$ZPMON.*
ServerName State LastError ErrorDetail
#ZMSGQ STARTED 0 0
#ZPLS STARTED 0 0
#ZPNS STARTED 0 0
#ZTA00 STARTED 0 0
#ZTA01 STARTED 0 0
#ZTA02 STARTED 0 0
#ZTA03 STARTED 0 0
#ZTA04 STOPPED 0 0
#ZTA05 STOPPED 0 0
#ZTA06 STOPPED 0 0
#ZTA07 STOPPED 0 0
#ZTA08 STOPPED 0 0
#ZTA09 STOPPED 0 0
#ZTA10 STOPPED 0 0
#ZTA11 STOPPED 0 0
#ZTA12 STOPPED 0 0
#ZTA13 STOPPED 0 0
#ZTA14 STOPPED 0 0
#ZTA15 STOPPED 0 0
Total Errors = 0 Total Warnings = 0