G06.31 Software Installation and Upgrade Guide

Installing the G06.31 RVU
G06.31 Software Installation and Upgrade Guide544626-002
6-22
Recovery for Problems Installing the G06.31 RVU
When you finally run ZPHIRNM, these lines are written to the log:
Note: merge_whatis needs to be run to update the man pages.
Files in a whatis.frag directory have changed.
The merge_whatis is a shell script in /bin that creates and updates the whatis
database used by the OSS shell man, apropos, and whatis commands. You must
run the merge_whatis command once against each directory that contains the man
page files to be used.
You will run merge_whatis after the coldload. Running the merge_whatis
command is documented in Steps for Running ZPHIRNM on page 11-5.
If you have OSS configured to run the OSS merge_whatis utility automatically, you
can ignore running merge_whatis.
Recovery for Problems Installing the G06.31
RVU
If you receive an error indication in the Requests, Status, or EMS Events windows, you
might have to reinitiate the Build/Apply. See the
DSM/SCM Messages Manual
to
determine the nature and severity of the problem.
Cancel Pending Build/Apply Requests
1. Select the request to be canceled.
2. Select Requests>Cancel request.
The cancel request action takes a few minutes to finish.
3. Using the Planner Interface, rename the old software inputs:
a. In the Software in Archive dialog box, select the G06.31 RVU software input.
b. Select File>Show software input description to display the SUT Description
dialog box.
Note. If you inadvertently close the Status dialog box, reopen it by selecting Requests>
Requests list and then double-clicking the request.
Note. If you cannot cancel the Build request through the DSM/SCM Planner Interface, use
the DSM/SCM Target Interface (ZPHITI) to cancel the request. See the
DSM/SCM Users
Guide
and online help for more information.