G06.31 Software Installation and Upgrade Guide
Overview of Installing G06.31
G06.31 Software Installation and Upgrade Guide—544626-002
1-19
Upgrading NonStop S-Series Servers
Upgrading NonStop S-Series Servers
If you are upgrading from the NonStop S7000 system (NSR-W), and before you
upgrade to S76000 (NSR-X), S86000 (NSR-Y) / S7600 (NSR-E), NonStop S7800
(NSR-J), S78000 (NSR-H), S88000 (NSR-Z), you must change the
SYSTEM_PROCESSOR_TYPE in the ALLPROCESSORS paragraph in the
CONFTEXT file. In the CONFTEXT file, you can specify
only one
processor type. You
cannot specify NSR-D (S7400) or NSR-W (S7000) in a system with mixed processor
types. For example:
$TEMP CONFIGXX 2> type conftext
!comment
ALLPROCESSORS:
SYSTEM_PROCESSOR_TYPE NSR-C;
SYSTEM_VOLUME_SUBVOL $SYSTEM.SYS00;
.
.
For processor model S70000 running G06.24 and later RVUs, you must change the
processor type from NSR-G to NSR-C in the ALLPROCESSORS paragraph in the
CONFTEXT file. Failure to change the processor type when loading the new SYS
nn
causes an immediate %100441 halt. All other references to NSR-G are still valid,
which means that a query performed on the system returns NSR-G if the PMF is a
model 1951 PMF CRU (S70000).
10. Activate the new software
revision.
DSM/SCM ZPHIRNM
program
Section 11, Running
ZPHIRNM
11. Halt the processors. TSM Low-Level Link
Application or OSM Low-
Level Link
Halt the Processors on
page 12-2
12. Load the new operating
system from disk into the
memory of one processor
(system load).
TSM Low-Level Link
Application or OSM Low-
Level Link
Section 12, Loading the
G06.31 RVU
13. Reload (if necessary) the
new operating system into
the rest of the processors.
TACL RELOAD
command
Section 12, Loading the
G06.31 RVU
14. Perform firmware updates
required
after
system load.
TSM Service Application
or OSM Service
Connection.
Section 9, Updating
Processor Boot Code
Section C, Updating SWAN
Concentrator CLIP
Firmware
15. Configure specific optional
products, such as OSS,
Expand, SMF, RDF, and so
forth
SCF, macros Configure Specific Products
(Post-System Load) on
page 13-12
Table 1-6. Tasks and Tools for Installing the G06.31 RVU (page 2 of 2)
To Perform This Task... Use This Tool... Documented in...