Gigabit Ethernet 4-Port Adapter Installation and Support Guide
Replacing a G4SA
Gigabit Ethernet 4-Port ServerNet Adapter Installation and Support Guide—528166-006
3-23
Verify that the Communications Lines are Restarted
6. Use the SCF STATUS ADAPTER with the SUB ALL option to verify that the SWAN 
concentrator is in the STARTED state. 
STATUS ADAPTER $ZZWAN.#adapter-name, SUB ALL
The SUB ALL option displays status information for the ADAPTER object and its 
subordinate objects. 
7. Use the SCF STATUS DEVICE command to verify that the WAN subsystem IOPs 
are in the STARTED state (see Example 3-34). 
STATUS DEVICE $ZZWAN.#device-name
8. Verify the lines are in the STARTED state: 
•
For a single line, use the SCF STATUS LINE command (see Example 3-35). 
STATUS LINE $line-name
•
For an Expand multiline path, use the SCF STATUS PATH command (see 
Example 3-36
). 
STATUS PATH $path-name
Example 3-34. SCF STATUS DEVICE Command
->STATUS DEVICE $ZZWAN.#LINE1
WAN Manager STATUS DEVICE for DEVICE \MYSYS.$ZZWAN.#LINE1
 State :........ STARTED
 LDEV number.... 110
 PPIN........... 2 ,13  BPIN......... 3 ,14
Example 3-35. SCF STATUS LINE Command
->STATUS LINE $LINE1
EXPAND Status LINE1
Name   State PPID  BPID  CIU-Path ConMgr-LDEV
$SATHO0  STARTED 2, 10  3, 7   A  91
Example 3-36. SCF STATUS PATH Command
->STATUS PATH $PATH
EXPAND Status PATH
Name   State  PPID BPID Lines #
$PSHOT  STARTED  2, 15 3, 15  2










