Gigabit Ethernet ServerNet Adapter Installation and Support Guide

Relocating a GESA
Gigabit Ethernet Adapter Installation and Support Guide523628.005
4-2
Prepare to Relocate a GESA
Prepare to Relocate a GESA
GESAs can be installed in slots 53 and 54 of a processor enclosure and in slots 51, 52,
53, and 54 of an I/O enclosure (see Figure 2-1 on page 2-4). GESA slots should not
be left empty. When no GESA is installed in a slot, a ServerNet adapter filler panel
(U09021) should be installed in the empty slot to maintain proper air flow and to reduce
electromagnetic interference (EMI).
Gather the Proper Tools
For the proper tools, refer to Gather the Proper Tools on page 2-6.
Print the GESA Planning Worksheet
Follow the procedure described in Print the GESA Planning Worksheet on page 3-3.
Identify Any Communications Lines and ServerNet Wide Area
Network (SWAN) Using the GESA
Follow the procedure described in Identify Any Communications Lines and ServerNet
Wide Area Network (SWAN) Using the GESA on page 3-4.
Redirect or Stop Any Customer Applications Using the GESA
Follow the procedure described in Redirect or Stop Any Customer Applications Using
the GESA on page 4-2.
Note. GESAs (including GESA connections via S-series I/O enclosures) are not supported on
NonStop Blade Systems.
Table 4-1. Preparation Checklist
Step Description
1.
Gather the Proper Tools.
2.
Print the GESA Planning Worksheet.
3.
Identify Any Communications Lines and ServerNet Wide Area Network (SWAN)
Using the GESA.
4.
Redirect or Stop Any Customer Applications Using the GESA.
5.
Stop the Communications Lines and SWAN Concentrator Line Using the GESA.
6.
Determine the Physical Location of the GESA.
7.
Stop the GESA.
8.
Label the Communication Cable Connected to the GESA.