NetBatch Manual

What’s New in This Manual
NetBatch Manual522460-004
xiv
Changes to the G06.27 Manual
Changed the range of job numbers for systems running G-series RVUs on pages
4-13, 6-187, A-23, and Glossary-5.
Changed the consideration on DST explaining how next-runtime is calculated after
DST on page 6-188.
Added the error message 2110-E on page A-25.
Changes to the G06.27 Manual
Updated the TACL RUN command with the REPORT and jobrun-database-
subvol attributes under Running NETBATCH on page 3-10.
Added the description for:
°
REPORT-ON on page 3-12
°
jobrun-database-subvol on page 3-13
Added the synopsis and syntax summary of the REPORT JOB under Job
Commands on page 6-17.
Added the new command, REPORT JOB, under Command Security 6-26.
Added the description for REPORT JOB Command on page 6-116.
Changes to the G06.16 Manual
Updated Section 2, Software Installation, to discuss use of DSM/SCM instead of
Install.
Added a consideration regarding when the scheduler INITIATION attribute is OFF
to RUNNOW JOB Command on page 6-128
Updated the descriptions of the READY and RUNNOW job states in Table 6-8, Job
States, on page 6-169
Added scheduler INITIATION attribute information to the considerations in SUBMIT
JOB Command on page 6-183
Added the message text to warning 0548-W on page A-12
Added message 0549-I on page A-12
Changes to the G06.15 Manual
Added new events in Section 3, Scheduler Planning, Configuration, and
Management
Changed the use of the RUNNOW command in Section 7, Attributes
Changed the scheduler behavior when a job with the EVERY attribute is held off in
Section 7, Attributes