NetBatch Manual

Scheduler Planning, Configuration, and
Management
NetBatch Manual522460-004
3-41
Dealing With Scheduler Log Files
Record 2: <Timestamp> <Description>
For example, the SWITCHLOG event will be logged as
Record 1: 06APR06 12:41:42 LOG SWITCHLOG
\NODE1.$DSMSCM.S2345678.LOGAAA TO \NODE1.$DSMSCM.S2345678.LOGAAB
Record 2: 06APR06 12:41:42 U_255,255 H_\NODE1.$ZTNT.#PT1RBGU
Event Keywords
Table 3-3. Scheduler Log File Keywords (page 1 of 3)
Keyword Description Example
A’VATE Suspended job reactivated by
ACTIVATE JOB command.
A'VATE JOB XYZ J_1
U_255,255H_\MELBDEV.$T4.#A
ABEND ABEND system message
received from process
specified in event.
ABEND CC_5 EXECUTOR-PROGRAM
J_2\MELBDEV.$X224:23831737
ABENDT ABEND system message text. ABENDT TACL fatal error: Couldn't open TACL
IN J_2 \MELB DEV.$X224:23831737
ABORT Job aborted because of event
or request (for example,
execution of STOP JOB
command).
ABORT JOB XYZ by NetBatch J_1
P_TACL\MELBDEV.$X206:23826617
U_255,255H_\MELBDEV.$T4.#A
ADD Object added in response to
user request.
ADD JOB XYZ C_DEFAULT:3
J_1U_255,255H_\MELBDEV.$T4.#A
ALIVE One process of a NonStop
process pair stopped.
ALIVE Process \MELBDEV.$X806:26047161
stopped
J_51 \MELBDEV.$X829:26053049
ALTER Object altered in response to
user request.
ALTER EXECUTOR E0
U_255,255H_\MELBDEV.$T4.#A
BACKUP Backup CPU specified for
scheduler not available, so
backup created in another
CPU.
BACKUP CPU 3 not available
U_255,255H_\MELBDEV.$T4.#A
BEGIN Job initiation (executor-
program process started).
BEGIN JOB (SUPER.SUPER)XYZ
E_E1L_1135 J_1 U_255,255
CHKPNT Scheduler’s backup process
took over.
CHKPNT takeover from
DOIT^SCHEDULER+%003036I
U_255,255H_\MELBDEV.$T4.#A
CLOCK System clock changed. CLOCK CHANGED 3458221102
microseconds, TIME ADJUSTMENT
CLOSE CLOSE system message
received from process
specified in event.
CLOSE
\MELBDEV.$:0:31:20665784U_255,255