NET/MASTER RMS Management and Operations Guide
Operational Considerations
Planning for, Installing, and Managing RMS
3–28 115415 NonStop NET/MASTER RMS Management and Operations Guide
The number of NCL utilities and applications that are expected to be running at
the same time that RMS is processing recovery actions
For further information on the SYSPARMS NCLUMAX parameter, refer to the
NonStop NET/MASTER MS Command Reference Manual.