NonStop S-Series Hardware Installation and FastPath Guide (G06.25+)
HP NonStop S-Series Hardware Installation and FastPath Guide—529443-001
7
14. Case Study: Installing and Configuring a
System
14. Case Study: Installing and Configuring a System
About These Examples 14-2
Background for Developers Inc. 14-3
Hardware Configuration 14-4
Installation Documents 14-4
Case Study: Installation Document Checklist 14-5
Case Study: System Equipment Inventory Form 14-6
Case Study: Enclosure Arrangement Diagram 14-7
Case Study: Floor Plan 14-8
Case Study: Preinstalled I/O Device Cable Checklist 14-9
Case Study: Group 01 System Enclosure Checklist 14-10
Case Study: Group 01 Slot 50 PMF CRU Configuration Form 14-11
Case Study: Group 01 Slot 55 PMF CRU Configuration Form 14-12
Case Study: Group 01 Slot 53 E4SA Configuration Form 14-13
Case Study: Group 01 Slot 54 E4SA Configuration Form 14-14
Case Study: Group 02 System Enclosure Checklist 14-15
Case Study: Group 02 Slot 50 PMF CRU Configuration Form 14-16
Case Study: Group 02 Slot 55 PMF CRU Configuration Form 14-17
Case Study: Group 02 Slot 53 E4SA Configuration Form 14-18
Case Study: Group 02 Slot 54 E4SA Configuration Form 14-19
System Configuration: CONFTEXT File 14-20
LAN Environment at Developers Inc. 14-20
Registry of IP Addresses 14-20
Installing the System 14-22
Customizing the Configuration 14-22
Adding Ethernet 4 ServerNet Adapters (E4SAs) 14-23
Adding ConMgr Process 14-24
Configuring NonStop TCP/IP Stacks on E4SA Ports 14-25
Adding Persistent CLCI TACL, Expand Manager, and SCP Processes 14-27
Starting the $ZEXP Expand Manager Process 14-27
Adding a SWAN Concentrator 14-28
Adding a SWAN 2 Concentrator 14-28
Adding CP6100 Lines 14-29
Adding an ATP6100 Line 14-30
Adding a 5516 Printer 14-31
Adding an X.25 Line 14-32
Configuring and Starting the $NCP Network Control Process 14-33
Adding an Expand-Over-IP Line 14-33
Adding a Direct-Connect Line 14-34