NonStop S-Series Hardware Installation and FastPath Guide (G06.26+)

Configuring the System
HP NonStop S-Series Hardware Installation and FastPath Guide529876-001
10-5
Create the Operating Configuration
k. Select Restart the computer. Click Yes.
4. Unpack and install an Switch 2 using the documentation that comes with the
switch.
Switch 1 is the switch installed in the initial setup configuration. Switch 2 is the
switch you add for fault tolerance.
5. Move the cable attached to the PMF CRU in group 01, slot 55, from Switch 1 to
Switch 2.
To maintain EMC compliance in NonStop S-series systems, Ethernet cables must
be equipped with a ferrite suppression component. Install the Ethernet cables that
connect the PMF CRUs to the Ethernet switches or hubs with the ferrite end of the
cables connected to the PMF CRUs.
a. At Switch 1, disconnect the cable attached to the Ethernet port on the PMF
CRU in slot 55, group 01.
b. Reconnect this end of the cable to any port on Switch 2 except the cascade
port. Insert the RJ-45 plug on the cable into the RJ-45 jack on the Ethernet
switch or hub until the tab on the plug clicks into place as shown in
Figure 10-3.