NonStop S-Series Hardware Installation and FastPath Guide (G06.27+)

Contents
HP NonStop S-Series Hardware Installation and FastPath Guide540460-001
xvi
Figures (continued)
Figures (continued)
Figure C-11. Power-On Cables: Three Processor Enclosures, One I/O
Enclosure C-7
Figure C-12. Power-On Cables: Three Processor Enclosures, Two I/O
Enclosures C-7
Figure C-13. Power-On Cables: Three Processor Enclosures, Three I/O
Enclosures C-8
Figure C-14. Power-On Cables: Four Processor Enclosures, No I/O Enclosures C-8
Figure C-15. Power-On Cables: Four Processor Enclosures, One I/O Enclosure C-8
Figure C-16. Power-On Cables: Four Processor Enclosures, Two I/O
Enclosures C-8
Figure C-17. Power-On Cables: Four Processor Enclosures, Three I/O
Enclosures C-9
Figure C-18. Power-On Cables: Four Processor Enclosures, Four I/O
Enclosures C-9
Figure E-1. Packaging of Enclosure Stack E-6
Figure E-2. Velcro Strips on Loading Pallet E-8
Figure E-3. Rolling the Stack to the Installation Area E-9
Figure E-4. Enclosure Stacks in Final Positions E-9
Figure E-5. Lowering Legs of Base Enclosure E-9
Figure E-6. Groundstrap Connector Locations E-10
Figure E-7. Power-On Cable Connectors E-11
Figure E-8. Power-On Cables: One Processor Enclosure E-11
Figure E-9. Power-On Cables: One Processor Enclosure, One I/O Enclosure E-11
Figure E-10. Power-On Cables: One Processor Enclosure, Two I/O
Enclosures E-12
Figure E-11. Power-On Cables: Two Processor Enclosures E-12
Figure E-12.
Power-On Cables: Two Processor Enclosures, One I/O
Enclosure E-12
Figure E-13. Power-On Cables: Two Processor Enclosures, Two I/O
Enclosures E-12
Figure E-14. EPO Cable E-13
Figure E-15. Connecting an Ethernet Switch to Group 01 E-18
Figure E-16. Attaching SCSI Cable to PMF CRU E-20
Figure E-17. Adding a System Console to the Operating Configuration E-46