NonStop S-Series Hardware Installation and FastPath Guide (G06.29+)

Installing Enclosures
HP NonStop S-Series Hardware Installation and FastPath Guide541880-002
2-17
Slot Assignments for NonStop S-Series Enclosures
Table 2-3. Slot Assignments: Tetra 16 Topology
Enclosure Hardware Slots Notes
Processor SEBs and
MSEBs
51, 52,
53, 54
To attach I/O enclosures to the processor enclosures in
the inner tetrahedron, you must install SEBs or MSEBs
in slots 53 and 54 of the processor enclosures.
If ServerNet adapters are in slots 51 and 52, you cannot
later attach I/O enclosures to the processor enclosure.
ServerNet
adapters
51, 52,
53, 54
The number of slots that support adapters depends on
the number of enclosures in the system.
I/O ServerNet
adapters
51, 52,
53, 54
To attach I/O enclosures to the processor enclosures in
the inner tetrahedron, you must install SEBs or MSEBs
in slots 53 and 54 of the processor enclosures.
Figure 2-13. Appearance Side, Processor Enclosure
Component
Disk
Disk
SCSI terminator
SCSI terminator
PMCU
Battery
Group ID switch
Fan
Reserved (except for S7000)
Power supply (except for S7000)
Slot
01 - 08
11 - 18
09, 10
19, 20
21, 22
23, 28
24, 27
25, 26
29, 30
31, 32
Group Service LED
09
10
19
20
23
24 25 26 27
28
01 02 03 04 05 06 07 08
1811 12 13 14 15 16 17
21 22
29 30
31 32
VST622.vsd