NonStop S-Series Hardware Installation and FastPath Guide (G06.29+)

Powering On and Starting the System
HP NonStop S-Series Hardware Installation and FastPath Guide541880-002
8-8
Power-On Procedure Using AC Power Cords
2. When you are ready to power on the system, plug the AC power cords for the
enclosures into the designated AC receptacles indicated on the Floor Plan
Diagram.
If any piece of equipment has two power cords, plug each power cord into an AC
power outlet controlled by a different breaker.
Start with the highest numbered group enclosure. Then work through the remaining
enclosures in descending group-number order, from the highest group to group 01.
The last group to be powered on is group 01.
If the AC power cords have a twist-lock plug on the end that connects to the AC
receptacle, the receptacles at your site must be equipped to accept the twist-lock
plugs.
If the dedicated AC receptacles are controlled by circuit breakers and currently do
not have power, switch the circuit breakers on to provide power to the system.
Figure 8-5. Connecting an AC Power Cord to an Enclosure With a Power Shelf
VST983.vsd
AC Power Cord
Power Cord
Retainer
Locking
Bar
Slots on
Plug Housing
01