9 Performing Post-Startup Tasks
This section describes the tasks that you must perform after the NonStop S-series
server has been powered up and started.
Testing the System
This subsection provides examples of the commands you can use to do the following
after the system has been started:
These procedures are not meant to be complete and might not be appropriate for your
system. For more information about system components and configurations, see
Section 1, Introduction.
Note. If you installed an IOAM enclosure, Fibre Channel Disk Module (FCDM)s, or ESS, all
post-startup tasks are performed by your service provider.
Topic Page
Testing the System
9-1
Completing Final Installation Steps 9-12
Restarting the Inspect Monitor Process 9-14
Configuring the OSM or TSM Environment 9-16
Test Page
Check Power Supplies
9-2
Check System Enclosure Components 9-2
Check Critical System Processes 9-6
Check Disk Subsystem Status 9-7
Check Tape Subsystem Status 9-11
Test the Disk Drives 9-8
Test the Communications Lines 9-10
Test the Tape Subsystems 9-11