NonStop S-Series Hardware Installation and FastPath Guide (G06.29+)
Contents
HP NonStop S-Series Hardware Installation and FastPath Guide—541880-002
xvii
Tables (continued)
Tables (continued)
Table B-5. Tetra 8 Cabling: One Processor Enclosure, One I/O Enclosure B-15
Table B-6. Tetra 8 Cabling: One Processor Enclosure, Two I/O Enclosures B-15
Table B-7. Tetra 8 Cabling: Two Processor Enclosures, No I/O Enclosures B-16
Table B-8. Tetra 8 Cabling: Two Processor Enclosures, One I/O Enclosure B-16
Table B-9. Tetra 8 Cabling: Two Processor Enclosures, Two I/O Enclosures B-16
Table B-10. Tetra 8 Cabling: Three Processor Enclosures, No I/O Enclosures B-17
Table B-11. Tetra 8 Cabling: Three Processor Enclosures, One I/O Enclosure B-17
Table B-12. Tetra 8 Cabling: Three Processor Enclosures, Two I/O
Enclosures B-18
Table B-13. Tetra 8 Cabling: Three Processor Enclosures, Three I/O
Enclosures B-18
Table B-14. Tetra 8 Cabling: Four Processor Enclosures, No I/O Enclosures B-21
Table B-15. Tetra 8 Cabling: Four Processor Enclosures, One I/O Enclosure B-21
Table B-16. Tetra 8 Cabling: Four Processor Enclosures, Two I/O Enclosures B-22
Table B-17. Tetra 8 Cabling: Four Processor Enclosures, Three I/O
Enclosures B-22
Table B-18. Tetra 8 Cabling: Four Processor Enclosures, Four I/O
Enclosures B-23
Table D-1. Troubleshooting the Expand Connection Procedure D-22
Table D-2. Keyboard Is Inoperative D-32
Table D-3. Mouse Is Inoperative D-33
Table D-4. Monitor Screen Is Blank D-34
Table D-5. System Unit Is Inoperative D-35
Table D-6. Monitor Screen Is Frozen D-36
Table D-7. Application Fails Immediately When Started D-37
Table D-8. Install Windows XP Professional Operating System D-39
Table D-9.
Set Up Date and Time D-43
Table D-10.
Set Event Log Settings D-44
Table D-11. Install Internet Explorer D-46
Table E-1. ServerNet Cables for One Processor Enclosure, One I/O
Enclosure E-14
Table E-2. ServerNet Cables for Two Processor Enclosures, No I/O
Enclosures E-14
Table E-3. ServerNet Cables for Two Processor Enclosures, One I/O
Enclosure E-14
Table E-4. ServerNet Cables for Two Processor Enclosures, Two I/O
Enclosures E-15
Table F-1. SCF ADD DEVICE Command Worksheet F-18
Table F-2. COUP Worksheet F-20