NonStop S-Series Hardware Installation and FastPath Guide (G06.29+)

Introduction
HP NonStop S-Series Hardware Installation and FastPath Guide541880-002
1-3
Installation Overview
Installation Overview
Step Documentation Notes (page 1 of 2)
1. Decide which installation process to use.
This guide Use if you are:
Installing a NonStop S-series
server for the first time
OR
Installing a Tetra 16 system
Appendix E, FastPath Tasks: Required
Appendix F, FastPath Tasks: Optional
Use if you are BOTH:
Familiar with installing NonStop
S-series servers
AND
Installing a Tetra 8 system
2. Plan the installation of the server, system console, local area network (LAN) subsystem,
and wide area network (WAN) subsystem.
Section 2, Installing Enclosures
NonStop S-Series Planning and Configuration
Guide
G06.nn Release Version Update Compendium
LAN Configuration and Management Manual
TSM Configuration Guide
OSM Migration Guide
WAN Subsystem Configuration and
Management Manual
Each server is shipped with a
customized version of the operating
system image already installed.
This operating system image
comes preconfigured with
ServerNet adapters and essential
system devices such as disk and
tape subsystems.
3. Install the server.
Section 2, Installing Enclosures
Section 3, Cabling Enclosures
Section 4, Installing Service-Side Doors
4. Install an I/O adapter module (IOAM) enclosure.
Caution: IOAM enclosures must be installed
by service providers trained by HP. Your
service provider should refer to the Modular
I/O Installation and Configuration Guide which
is located in the NTL Hardware Service and
Maintenance collection in the Support and
Service Library.
For connection to other storage
options, you can install IOAM
enclosures. Each IOAM enclosure
is mounted into a standard 19-inch
rack and connects to the MSEB of
S76000 and later NonStop S-series
systems. Each IOAM enclosure
provides space for up to 10
specially designed ServerNet
adapters.
5. Install the primary system console.