NonStop S-Series Hardware Installation and FastPath Guide (G06.29+)

Introduction
HP NonStop S-Series Hardware Installation and FastPath Guide541880-002
1-7
Installation Overview
Tools
The tools you might need when installing server components include:
Component Tool Purpose
System
enclosure
ESD protection kit Protect components against electrostatic
discharge
Heavy-freight-handling
equipment
Move shipping pallets to installation area
Safety glasses Prevent eye injury from flying particles
Scissors or cutters Clip cable ties and cut banding straps
Flashlight For lighting dark areas
Labels
Pens or pencils
Label cables
3/4-inch (19-mm) or
9/16-inch (15-mm)
open-end wrench
Lower system enclosure leveling pads (might
have 3/4-inch nuts or 9/16-inch nuts)
Phillips screwdriver Loosen and tighten Phillips screws, including
groundstrap screws
Stubby Phillips
screwdriver
Loosen and tighten AC power cord retainer
screws on some processor and I/O enclosures
without power shelves
4-mm diagonal wrench
(provided with server)
Unlock enclosure door
Tape
subsystem
15/16-inch (24-mm) or
adjustable, open-end
wrench
Lower leveling pads on 5175 or 519x tape
subsystem enclosures
Slotted screwdriver Loosen and tighten slotted-head screws,
including those on 5175 tape subsystem
shipping restraints