NonStop S-Series Hardware Installation and FastPath Guide (G06.29+)

FastPath Tasks: Required
HP NonStop S-Series Hardware Installation and FastPath Guide541880-002
E-8
3. Unpack and Unload Server
c. Position the unloading ramp against the pallet on the same side as the end
piece.
d. Position the Velcro strips. Ensure the Velcro strips hold the ramp firmly against
the pallet:
e. To prevent snagging hazards, raise the leveling pads on the base enclosure
fully before you move the enclosure stack.
Figure E-2. Velcro Strips on Loading Pallet
WARNING. Before moving an enclosure stack:
Always get at least one other person to help you move an enclosure stack. If the floor is
uneven, use four people to move the enclosure stack, or contact a service provider.
Move each enclosure stack slowly and gently, avoiding all unnecessary shock.
When pushing the enclosure stack, push on the frame. Do not push or pull on a plastic
enclosure door. Do not grasp the cable channels on the service side.
Casters on the appearance side of the enclosure swivel, but casters on the service side do
not swivel. If you position the swiveling appearance side casters to go first, it is easier to
move the enclosure stack over bumps in the floor.
A double-high enclosure stack tends to be top-heavy. When moving the enclosure stack
off the pallet and down the ramp, do so carefully.
If you plan to stack single-high system enclosures, you need at least five trained people.
Anyone who lifts a system enclosure to stack it must be at least five feet tall and capable
of lifting and holding approximately 25 pounds (11 kilograms).
vst988.vsd
Velcro Strips