3. Unpack and Unload Server
5. Roll the enclosure or stack off the pallet.
a. Using at least two people, grasp the frame of the stack and slowly roll the
enclosure stack off the pallet, down the ramp, and to the installation area:
6. Move the enclosure stack to its final position. Side frames can touch each other:
7. With a 3/4-inch (19-mm) or a 9/16-inch (15-mm) open-end wrench, lower each leg
on the base enclosure and tighten it against the floor:
8. Repeat the unpacking and unloading tasks for all remaining system enclosures.
Figure E-3. Rolling the Stack to the Installation Area