NonStop S-Series Hardware Installation and FastPath Guide (G06.29+)
FastPath Tasks: Required
HP NonStop S-Series Hardware Installation and FastPath Guide—541880-002
E-11
5. Inventory and Inspect All Components
5. Inventory and Inspect All Components
1. In each system enclosure, verify that all components ordered are present.
2. In each system enclosure, inspect the disk drives, PMF CRUs, IOMF CRUs, SEBs
if present, MSEBs if present, and ServerNet adapters.
3. Reseat any CRU that appears to be improperly seated.
6. Connect the Power-On Cables
1. Find the power-on cables included in a box with the system.
2. Find the power-on cable connectors on the service side of each enclosure:
3. Connect the power-on cables according to the appropriate diagram:
Note. The appearance side of the system enclosure is equipped with a door. If neces-
sary, open the door with the 4-mm (5/32-inch) hex wrench that is located in the OPEN
FIRST box or taped to the service side of the enclosure.
Figure E-7. Power-On Cable Connectors
Figure E-8. Power-On Cables: One Processor Enclosure
Figure E-9. Power-On Cables: One Processor Enclosure, One I/O Enclosure
Power-On Cable
VST703.vsd
01
VST110.vsd
VST111.vsd
0111