NonStop S-Series Hardware Installation and FastPath Guide (G06.29+)

Introduction
HP NonStop S-Series Hardware Installation and FastPath Guide541880-002
1-43
Installation Overview
Cable Labels
Label both ends of each cable. Figure 1-20 shows a cable that connects port 5 of an
SEB in slot 51 of the group 01 enclosure to the ServerNet port on the IOMF CRU in
slot 50 of the group 11 enclosure.
For more information about labeling, see the NonStop S-Series Planning and
Configuration Guide.
Cable Routing
To route ServerNet cables across enclosures:
1. Route them straight down.
2. Secure them to a cable support.
3. Direct them into cable channels.
Secure a cable to the cable support below the CRU to which the cable connects.
Secure the cable so that if you remove that CRU, you do not disrupt other cables.
Secure cables to the anchors on the cable supports. Secure ServerNet cables to
the outer cable support, and Ethernet or power-on cables to the inner one.
In a double-high stack, use only the base enclosure cable channels.
Guideposts guide cables from a stackable enclosure into the cable channels of a
base enclosure.
Guideposts on base enclosures are not often used, but you can route cables
underneath these guideposts to use up extra cable length.
Figure 1-20. ServerNet Cable Labeling
Caution. Do not pass cables or cords through the handles of CRUs or FRUs. The cables or
cords might become accidentally unplugged during later procedures. See Figure 1-21 for
proper cabling.
VST823.vsd
SEB 015105
IOMF 1150
S
E
B
0
1
5
1
0
5
I
O
M
F
1
1
5
0
S
E
B
0
1
5
1
0
5
I
O
M
F
1
1
5
0
SEB 015105
IOMF 1150