NonStop S-Series Planning and Configuration Guide (G06.25+)

Table Of Contents
Contents
HP NonStop S-Series Planning and Configuration Guide523303-015
vii
9. The Planning and Configuration Process
Internal Disk Drives 8-3
Supported Internal Disk Drives 8-3
Disk Drives for 16-GB Processors 8-3
Minimum Disk-Drive Configuration 8-4
Locations of $DSMSCM and $AUDIT as Mirrored Volumes 8-4
Other Internal Disk Drives 8-4
External Disk Drives 8-5
Tape Drives 8-5
Virtual TapeServer 8-5
Tape Drives for 16-GB Processors 8-5
Initial Default Values for System Attributes 8-6
Changing System Name and Number 8-8
Initial Configuration Files 8-8
Objects Configured in the Initial CONFIG File 8-9
Objects That Must Not Be Renamed 8-10
Command Files for Objects Not Configured in the Initial CONFIG File 8-11
Files Used to Create the Initial CONFIG File 8-11
CONFBASE File 8-12
Naming Conventions Used in the SCF0000 File for SCF Objects 8-13
SCF Commands to Automate Disk Configuration 8-14
SWAN Concentrator Configurations 8-15
Ethernet Ports on PMF CRUs and IOMF CRUs 8-15
ServerNet Adapter Configurations 8-16
Factory-Default Configuration of MFIOBs 8-16
Initial IP Addresses for System and System Consoles 8-17
IOAM Enclosures 8-18
Part II. Planning Tasks
9. The Planning and Configuration Process
People and Functions 9-2
The Installation Forms 9-2
Advantages of Using the Installation Forms 9-3
Preparing to Plan 9-3
Installing a New System 9-4
Plan the System 9-4
Install the System 9-6
Test the Customized Operating System 9-7
Perform Final Tasks 9-7