NonStop S-Series Planning and Configuration Guide (G06.25+)

Table Of Contents
Contents
HP NonStop S-Series Planning and Configuration Guide523303-015
ix
11. Planning for LAN Communications
Configuring the Maximum Power-Fail Delay Time 10-7
Battery Considerations 10-7
11. Planning for LAN Communications
Dedicated LANs 11-1
Dedicated Service LAN for OSM or TSM 11-1
Dedicated LAN for SWAN Concentrators 11-2
Public LANs 11-2
Multiple IP Addresses Needed 11-4
Planning for a Dedicated Service LAN 11-5
Initial Dedicated Service LAN Configuration 11-5
Operating Configurations of Dedicated Service LANs 11-6
Planning for Remote Dial-In and Dial-Out Support 11-13
12. Site Planning and Preparation
Related Sources 12-1
Selecting the Rooms and Assigning Floor Space 12-2
Planning for Data Communications 12-3
Requirements 12-4
Labeling Communications Cables 12-4
SWAN Concentrators 12-5
Planning for System Consoles 12-5
Planning for System Power 12-6
Considerations 12-6
Branch Circuits 12-8
Uninterruptible Power Supplies (UPSs) 12-8
Ethernet Switches or Hubs 12-9
System Enclosures 12-9
IOAM Enclosures 12-9
Peripheral Devices 12-9
AC Power Cords 12-9
Meeting the Environmental Requirements 12-10
Computer-Room Construction 12-10
Temperature and Humidity 12-10
Fire and Safety Precautions 12-11
Emergency Power-Off (EPO) Equipment 12-11
Electrostatic Discharge (ESD) Control and Protection 12-12
Other Factors 12-13
Preparing the Delivery Route 12-13