NonStop S-Series Planning and Configuration Guide (G06.25+)

Table Of Contents
Contents
HP NonStop S-Series Planning and Configuration Guide523303-015
x
13. Completing the Installation Plan
13. Completing the Installation Plan
Create the Installation Schedule 13-1
Assemble the Installation Document Packet 13-2
Installation Document Checklist 13-3
System Equipment Inventory Form 13-5
Enclosure Arrangement Diagram 13-7
Floor Plan 13-9
Preinstalled I/O Device Cable Checklist 13-11
System Enclosure Checklist 13-13
PMF CRU Configuration Forms 13-16
IOMF CRU Configuration Forms 13-20
ServerNet Adapter Configuration Forms 13-22
ServerNet Cluster Configuration Form 13-22
ServerNet Cabling Forms 13-23
Cross-Row Cabling Worksheets 13-25
IOAM Worksheets 13-26
Final Planning Checklist 13-27
Finish Planning 13-28
14. Planning for CRU Replacement
ServerNet Communication Pathways Worksheets 14-1
Completing the Worksheets 14-3
1. Highlight All System Enclosures 14-4
2. Black Out the CRU to Be Removed 14-5
3. Trace Unaffected Pathways 14-6
4. Draw a Line Around Affected Groups 14-7
15. Planning for System Configuration
Offline Configuration Tasks 15-1
Application Reconfiguration 15-1
Installing a New RVU 15-1
Installing a Product Revision 15-2
Changing the System Name, System Number, or Time Attributes 15-2
Changing the System Topology 15-2
Changing the CONFTEXT File 15-2
Online Configuration Tasks 15-3
Subsystem Control Facility (SCF) 15-3
Kernel-Managed Swap Facility (KMSF) 15-8
OSM Package 15-9