NonStop S-Series Planning and Configuration Guide (G06.25+)
Table Of Contents
- What’s New in This Guide
- About This Guide
- 1 Terms and Concepts
- NonStop S-Series Servers
- Enclosures
- Components
- Components, Processor Enclosure Without Power Shelf, Appearance Side
- Components, Processor Enclosure Without Power Shelf, Service Side
- Components, I/O Enclosure Without Power Shelf, Appearance Side
- Components, I/O Enclosure Without Power Shelf, Service Side
- Components, Processor Enclosure With Power Shelf, Appearance Side
- Components, Processor Enclosure With Power Shelf, Service Side
- Components, I/O Enclosure With Power Shelf, Appearance Side
- Components, I/O Enclosure With Power Shelf, Service Side
- Components in NonStop S76000, S86000, and Later Configurations
- Cluster Switch Enclosure
- IOAM Enclosure Components
- CRU Identification, System Enclosures
- FRU Identification, IOAM Enclosures
- CRUs and FRUs
- CRU/FRU Replacement Tools
- ServerNet Architecture
- Networking
- 2 The ServerNet Communications Network
- 3 Topologies
- 4 System Components
- Appearance Side of System Enclosures
- Service Side of System Enclosures
- Group ID Label
- Module ID Label
- Group Service LED
- SEBs and MSEBs
- Associated Fabrics
- Adapter Slots and Associated Fabrics
- ServerNet Adapters
- Filler Panels
- Slot Assignments for Slots 51 Through 54
- Emergency Power-Off (EPO) Connector
- Processor Multifunction (PMF) CRUs
- Configurations of Memory Units
- I/O Multifunction (IOMF) CRUs
- Enclosure Doors
- Tall Enclosure Door
- Enclosure Side Panel
- Plug-in Cards
- Typical PIC Installations
- System Console
- Tape Drives
- SWAN Concentrators
- External Disk Drives
- ServerNet Clusters
- IOAM Enclosures
- 5 ServerNet Cabling
- 6 ServerNet Communication Pathways
- 7 Enclosure Arrangements and Cable Connections
- 8 Initial Configurations
- Processor Numbers and Locations
- Processor Types and Memory Sizes
- Internal Disk Drives
- External Disk Drives
- Tape Drives
- Initial Default Values for System Attributes
- Initial Configuration Files
- Objects Configured in the Initial CONFIG File
- Objects That Must Not Be Renamed
- Command Files for Objects Not Configured in the Initial CONFIG File
- Files Used to Create the Initial CONFIG File
- CONFBASE File
- Naming Conventions Used in the SCF0000 File for SCF Objects
- SCF Commands to Automate Disk Configuration
- SWAN Concentrator Configurations
- Ethernet Ports on PMF CRUs and IOMF CRUs
- ServerNet Adapter Configurations
- Factory-Default Configuration of MFIOBs
- Initial IP Addresses for System and System Consoles
- IOAM Enclosures
- 9 The Planning and Configuration Process
- People and Functions
- The Installation Forms
- Preparing to Plan
- Installing a New System
- Changing an Existing System
- Changing the System Name or System Number
- Adding a System Enclosure
- Adding Memory to a Processor
- Adding a System Console
- Enclosure Interleaving for Storage Devices
- Configuring $SYSTEM Disk Slots
- Adding an Internal Disk Drive
- Changing the Configuration of a Disk Drive
- Adding a Tape Drive
- Changing the Configuration of a Tape Drive
- Adding a ServerNet Adapter
- Changing the System Configuration of a ServerNet Adapter
- Adding a SWAN or SWAN 2 Concentrator
- Changing the Configuration of a SWAN Concentrator
- Adding an AWAN Server
- Changing the Configuration of an AWAN Server
- Adding or Changing the WAN Subsystem
- Adding an Open SCSI Device
- Adding or Changing the Configuration of Other Peripheral Devices
- 10 Planning for System Availability and Support
- 11 Planning for LAN Communications
- 12 Site Planning and Preparation
- 13 Completing the Installation Plan
- Create the Installation Schedule
- Assemble the Installation Document Packet
- Installation Document Checklist
- System Equipment Inventory Form
- Enclosure Arrangement Diagram
- Floor Plan
- Preinstalled I/O Device Cable Checklist
- System Enclosure Checklist
- PMF CRU Configuration Forms
- IOMF CRU Configuration Forms
- ServerNet Adapter Configuration Forms
- ServerNet Cluster Configuration Form
- ServerNet Cabling Forms
- Cross-Row Cabling Worksheets
- IOAM Worksheets
- Final Planning Checklist
- Finish Planning
- 14 Planning for CRU Replacement
- 15 Planning for System Configuration
- A Part Numbers
- NonStop S-Series Enclosures
- System Components
- PMF CRUs
- Memory
- IOMF CRUs and Related Components
- SEBs and Related Components
- Doors, Racks, and Related Components
- Visual Image Package
- System Console and Related Components
- Internal Disk Drives
- External Magnetic Disk Drive and Related Components
- Tape Drives
- Tape Libraries
- 5190/94 Tape Drive and Related Components
- 5258 ACL Tabletop Tape Drive and Related Components
- 9840 Fibre Channel Tape Drive and Cables
- Linear Tape Open (LTO) Tape Drive and Related Components
- Loopback Test Equipment
- ServerNet Adapters and Related Components
- ServerNet/DA and Related Components
- CCSA and Related Components
- 6770 ServerNet Cluster and Related Components
- 6780 Switch and Related Components
- AWAN Servers and Related Components
- SWAN Concentrator and Related Components
- SWAN 2 Concentrator and Related Components
- Ethernet Switches and Hubs
- Modems and Modem Cable
- Universal Modem and Its AC Power Cords
- IOAM Products
- Cables and Cable Assemblies
- AC Power Cords, Enclosures Without Power Shelves
- AC Power Cords, Enclosures With Power Shelves
- B Specifications
- C Blank Forms
- D Case Study: ServerNet Cable Lengths
- E Guide to Server Manuals
- Manual Sets
- NonStop SSeries Server Manuals
- Availability Guides
- Adapter Manuals
- Configuration and Management Manuals
- Disk Manuals
- Generic Process Manuals
- Guardian Manuals
- Modular I/O Manuals
- Network Manuals
- SCF Manuals
- ServerNet Cluster Manuals
- Site Planning and Power Manual
- System Management Manual
- System Upgrade
- Tape Manuals
- OSM, TSM, System Console Manuals and Online Help
- Titles and Abstracts
- Manual Sets
- F Supported Hardware and Configurations
- G Modular Power Information
- Safety and Compliance
- Glossary
- Index

Site Planning and Preparation
HP NonStop S-Series Planning and Configuration Guide—523303-015
12-4
Requirements
Requirements
If you plan to allow access to your system by a remote service provider, you must have
at least one telephone line available in the room where the system is installed. It must
be a direct line that does not go through a switchboard. If you want to allow a dial-out
support connection to a remote service provider, such as the Global Customer Support
Center (GCSC), or to your support organization, you must connect the modem that is
connected to the system console to this line.
A second telephone line for voice communication with the local operator is highly
recommended. This line should be installed in the same room as the system,
preferably near the system console.
To ensure that at least one data communications line is up at all times, ask your
supplier to select different routes for each line.
Labeling Communications Cables
When the communications lines are installed, to tag each cable with a physical label,
preferably at both ends. The label must include at least one of the following:
•
The logical device name or physical interface name assigned to the line
•
A description of the equipment and connector that will connect to the cable
•
The slot location of the ServerNet adapter that will connect to the cable
More detailed labels might be more helpful:
•
You can color-code the labels for the X fabric and the Y fabric.
•
You can tag a cable at each end with information about where both ends go.
For example, a cable running between an SEB and an IOMF CRU can be tagged
at each end with complete information about which devices, groups, slots, and
ports it connects. You can use any labeling convention appropriate for your site;
one labeling convention is shown here.
Caution. Removal of hardware that has not failed will register as a failure and will cause a
dial-out to the GCSC call center.
Device Group Slot
ServerNet
Connector Label
SEB 01 53 4 SEB 015304
IOMF CRU 11 50 - IOMF 1150