NonStop S-Series Planning and Configuration Guide (G06.25+)
Table Of Contents
- What’s New in This Guide
- About This Guide
- 1 Terms and Concepts
- NonStop S-Series Servers
- Enclosures
- Components
- Components, Processor Enclosure Without Power Shelf, Appearance Side
- Components, Processor Enclosure Without Power Shelf, Service Side
- Components, I/O Enclosure Without Power Shelf, Appearance Side
- Components, I/O Enclosure Without Power Shelf, Service Side
- Components, Processor Enclosure With Power Shelf, Appearance Side
- Components, Processor Enclosure With Power Shelf, Service Side
- Components, I/O Enclosure With Power Shelf, Appearance Side
- Components, I/O Enclosure With Power Shelf, Service Side
- Components in NonStop S76000, S86000, and Later Configurations
- Cluster Switch Enclosure
- IOAM Enclosure Components
- CRU Identification, System Enclosures
- FRU Identification, IOAM Enclosures
- CRUs and FRUs
- CRU/FRU Replacement Tools
- ServerNet Architecture
- Networking
- 2 The ServerNet Communications Network
- 3 Topologies
- 4 System Components
- Appearance Side of System Enclosures
- Service Side of System Enclosures
- Group ID Label
- Module ID Label
- Group Service LED
- SEBs and MSEBs
- Associated Fabrics
- Adapter Slots and Associated Fabrics
- ServerNet Adapters
- Filler Panels
- Slot Assignments for Slots 51 Through 54
- Emergency Power-Off (EPO) Connector
- Processor Multifunction (PMF) CRUs
- Configurations of Memory Units
- I/O Multifunction (IOMF) CRUs
- Enclosure Doors
- Tall Enclosure Door
- Enclosure Side Panel
- Plug-in Cards
- Typical PIC Installations
- System Console
- Tape Drives
- SWAN Concentrators
- External Disk Drives
- ServerNet Clusters
- IOAM Enclosures
- 5 ServerNet Cabling
- 6 ServerNet Communication Pathways
- 7 Enclosure Arrangements and Cable Connections
- 8 Initial Configurations
- Processor Numbers and Locations
- Processor Types and Memory Sizes
- Internal Disk Drives
- External Disk Drives
- Tape Drives
- Initial Default Values for System Attributes
- Initial Configuration Files
- Objects Configured in the Initial CONFIG File
- Objects That Must Not Be Renamed
- Command Files for Objects Not Configured in the Initial CONFIG File
- Files Used to Create the Initial CONFIG File
- CONFBASE File
- Naming Conventions Used in the SCF0000 File for SCF Objects
- SCF Commands to Automate Disk Configuration
- SWAN Concentrator Configurations
- Ethernet Ports on PMF CRUs and IOMF CRUs
- ServerNet Adapter Configurations
- Factory-Default Configuration of MFIOBs
- Initial IP Addresses for System and System Consoles
- IOAM Enclosures
- 9 The Planning and Configuration Process
- People and Functions
- The Installation Forms
- Preparing to Plan
- Installing a New System
- Changing an Existing System
- Changing the System Name or System Number
- Adding a System Enclosure
- Adding Memory to a Processor
- Adding a System Console
- Enclosure Interleaving for Storage Devices
- Configuring $SYSTEM Disk Slots
- Adding an Internal Disk Drive
- Changing the Configuration of a Disk Drive
- Adding a Tape Drive
- Changing the Configuration of a Tape Drive
- Adding a ServerNet Adapter
- Changing the System Configuration of a ServerNet Adapter
- Adding a SWAN or SWAN 2 Concentrator
- Changing the Configuration of a SWAN Concentrator
- Adding an AWAN Server
- Changing the Configuration of an AWAN Server
- Adding or Changing the WAN Subsystem
- Adding an Open SCSI Device
- Adding or Changing the Configuration of Other Peripheral Devices
- 10 Planning for System Availability and Support
- 11 Planning for LAN Communications
- 12 Site Planning and Preparation
- 13 Completing the Installation Plan
- Create the Installation Schedule
- Assemble the Installation Document Packet
- Installation Document Checklist
- System Equipment Inventory Form
- Enclosure Arrangement Diagram
- Floor Plan
- Preinstalled I/O Device Cable Checklist
- System Enclosure Checklist
- PMF CRU Configuration Forms
- IOMF CRU Configuration Forms
- ServerNet Adapter Configuration Forms
- ServerNet Cluster Configuration Form
- ServerNet Cabling Forms
- Cross-Row Cabling Worksheets
- IOAM Worksheets
- Final Planning Checklist
- Finish Planning
- 14 Planning for CRU Replacement
- 15 Planning for System Configuration
- A Part Numbers
- NonStop S-Series Enclosures
- System Components
- PMF CRUs
- Memory
- IOMF CRUs and Related Components
- SEBs and Related Components
- Doors, Racks, and Related Components
- Visual Image Package
- System Console and Related Components
- Internal Disk Drives
- External Magnetic Disk Drive and Related Components
- Tape Drives
- Tape Libraries
- 5190/94 Tape Drive and Related Components
- 5258 ACL Tabletop Tape Drive and Related Components
- 9840 Fibre Channel Tape Drive and Cables
- Linear Tape Open (LTO) Tape Drive and Related Components
- Loopback Test Equipment
- ServerNet Adapters and Related Components
- ServerNet/DA and Related Components
- CCSA and Related Components
- 6770 ServerNet Cluster and Related Components
- 6780 Switch and Related Components
- AWAN Servers and Related Components
- SWAN Concentrator and Related Components
- SWAN 2 Concentrator and Related Components
- Ethernet Switches and Hubs
- Modems and Modem Cable
- Universal Modem and Its AC Power Cords
- IOAM Products
- Cables and Cable Assemblies
- AC Power Cords, Enclosures Without Power Shelves
- AC Power Cords, Enclosures With Power Shelves
- B Specifications
- C Blank Forms
- D Case Study: ServerNet Cable Lengths
- E Guide to Server Manuals
- Manual Sets
- NonStop SSeries Server Manuals
- Availability Guides
- Adapter Manuals
- Configuration and Management Manuals
- Disk Manuals
- Generic Process Manuals
- Guardian Manuals
- Modular I/O Manuals
- Network Manuals
- SCF Manuals
- ServerNet Cluster Manuals
- Site Planning and Power Manual
- System Management Manual
- System Upgrade
- Tape Manuals
- OSM, TSM, System Console Manuals and Online Help
- Titles and Abstracts
- Manual Sets
- F Supported Hardware and Configurations
- G Modular Power Information
- Safety and Compliance
- Glossary
- Index

Glossary
HP NonStop S-Series Planning and Configuration Guide—523303-015
Glossary-2
absolute pathname
absolute pathname. An Open System Services (OSS) pathname that begins with a
slash (/) character and is resolved beginning with the root directory. Contrast with
relative pathname
.
AC. See alternating current (AC).
accelerated mode. The operational environment in which Accelerator-generated RISC
instructions execute. See also TNS mode
and TNS/R native mode.
accelerated object code. The RISC instructions that result from processing a TNS object
file with the Accelerator program.
accelerated object file. The object file that results from processing a TNS object file with
the Accelerator program. An accelerated object file contains the original TNS object
code, the accelerated object code and related address map tables, and any binder and
symbol information from the original TNS object file.
Accelerator program. A program that processes a TNS object file and produces an
accelerated object file. Most TNS object code that has been accelerated runs faster on
TNS/R processors than TNS object code that has not been accelerated. The
Accelerator program (AXCEL) is run prior to running the accelerated linker, XLLINK.
access mode. The form of file access permitted for a user or process.
ACL. See automatic cartridge loader (ACL).
ACS. See automated cartridge subsystem (ACS).
action. An operation that can be performed on a selected resource.
activation. The operator action of putting software into use after the software has been
applied from the activation package to the target system.
activation package. A set of files containing product files, operator instructions, and
instructions for applying the software on the target system. It consists of a header file
containing the activation instructions and file attributes, multiple data files, Distributed
Systems Management/Software Configuration Manager (DSM/SCM) control
information, and Event Management Service (EMS) events.
AC transfer switch. A component of an HP NonStop™ Cluster Switch (model 6770) that
provides access to dual AC power sources and the ability to switch between the two
sources if one fails. The AC transfer switch draws power from its primary power source
as long as it is available. If the primary source fails, the AC transfer switch is switched
to draw power from the secondary power source.
adapter. See ServerNet adapter.
adapter cable. (1) A cable that connects components that have incompatible electrical
interfaces. (2) For the ServerNet wide area network (SWAN) concentrator, one of four