NonStop S-Series Planning and Configuration Guide (G06.25+)
Table Of Contents
- What’s New in This Guide
- About This Guide
- 1 Terms and Concepts
- NonStop S-Series Servers
- Enclosures
- Components
- Components, Processor Enclosure Without Power Shelf, Appearance Side
- Components, Processor Enclosure Without Power Shelf, Service Side
- Components, I/O Enclosure Without Power Shelf, Appearance Side
- Components, I/O Enclosure Without Power Shelf, Service Side
- Components, Processor Enclosure With Power Shelf, Appearance Side
- Components, Processor Enclosure With Power Shelf, Service Side
- Components, I/O Enclosure With Power Shelf, Appearance Side
- Components, I/O Enclosure With Power Shelf, Service Side
- Components in NonStop S76000, S86000, and Later Configurations
- Cluster Switch Enclosure
- IOAM Enclosure Components
- CRU Identification, System Enclosures
- FRU Identification, IOAM Enclosures
- CRUs and FRUs
- CRU/FRU Replacement Tools
- ServerNet Architecture
- Networking
- 2 The ServerNet Communications Network
- 3 Topologies
- 4 System Components
- Appearance Side of System Enclosures
- Service Side of System Enclosures
- Group ID Label
- Module ID Label
- Group Service LED
- SEBs and MSEBs
- Associated Fabrics
- Adapter Slots and Associated Fabrics
- ServerNet Adapters
- Filler Panels
- Slot Assignments for Slots 51 Through 54
- Emergency Power-Off (EPO) Connector
- Processor Multifunction (PMF) CRUs
- Configurations of Memory Units
- I/O Multifunction (IOMF) CRUs
- Enclosure Doors
- Tall Enclosure Door
- Enclosure Side Panel
- Plug-in Cards
- Typical PIC Installations
- System Console
- Tape Drives
- SWAN Concentrators
- External Disk Drives
- ServerNet Clusters
- IOAM Enclosures
- 5 ServerNet Cabling
- 6 ServerNet Communication Pathways
- 7 Enclosure Arrangements and Cable Connections
- 8 Initial Configurations
- Processor Numbers and Locations
- Processor Types and Memory Sizes
- Internal Disk Drives
- External Disk Drives
- Tape Drives
- Initial Default Values for System Attributes
- Initial Configuration Files
- Objects Configured in the Initial CONFIG File
- Objects That Must Not Be Renamed
- Command Files for Objects Not Configured in the Initial CONFIG File
- Files Used to Create the Initial CONFIG File
- CONFBASE File
- Naming Conventions Used in the SCF0000 File for SCF Objects
- SCF Commands to Automate Disk Configuration
- SWAN Concentrator Configurations
- Ethernet Ports on PMF CRUs and IOMF CRUs
- ServerNet Adapter Configurations
- Factory-Default Configuration of MFIOBs
- Initial IP Addresses for System and System Consoles
- IOAM Enclosures
- 9 The Planning and Configuration Process
- People and Functions
- The Installation Forms
- Preparing to Plan
- Installing a New System
- Changing an Existing System
- Changing the System Name or System Number
- Adding a System Enclosure
- Adding Memory to a Processor
- Adding a System Console
- Enclosure Interleaving for Storage Devices
- Configuring $SYSTEM Disk Slots
- Adding an Internal Disk Drive
- Changing the Configuration of a Disk Drive
- Adding a Tape Drive
- Changing the Configuration of a Tape Drive
- Adding a ServerNet Adapter
- Changing the System Configuration of a ServerNet Adapter
- Adding a SWAN or SWAN 2 Concentrator
- Changing the Configuration of a SWAN Concentrator
- Adding an AWAN Server
- Changing the Configuration of an AWAN Server
- Adding or Changing the WAN Subsystem
- Adding an Open SCSI Device
- Adding or Changing the Configuration of Other Peripheral Devices
- 10 Planning for System Availability and Support
- 11 Planning for LAN Communications
- 12 Site Planning and Preparation
- 13 Completing the Installation Plan
- Create the Installation Schedule
- Assemble the Installation Document Packet
- Installation Document Checklist
- System Equipment Inventory Form
- Enclosure Arrangement Diagram
- Floor Plan
- Preinstalled I/O Device Cable Checklist
- System Enclosure Checklist
- PMF CRU Configuration Forms
- IOMF CRU Configuration Forms
- ServerNet Adapter Configuration Forms
- ServerNet Cluster Configuration Form
- ServerNet Cabling Forms
- Cross-Row Cabling Worksheets
- IOAM Worksheets
- Final Planning Checklist
- Finish Planning
- 14 Planning for CRU Replacement
- 15 Planning for System Configuration
- A Part Numbers
- NonStop S-Series Enclosures
- System Components
- PMF CRUs
- Memory
- IOMF CRUs and Related Components
- SEBs and Related Components
- Doors, Racks, and Related Components
- Visual Image Package
- System Console and Related Components
- Internal Disk Drives
- External Magnetic Disk Drive and Related Components
- Tape Drives
- Tape Libraries
- 5190/94 Tape Drive and Related Components
- 5258 ACL Tabletop Tape Drive and Related Components
- 9840 Fibre Channel Tape Drive and Cables
- Linear Tape Open (LTO) Tape Drive and Related Components
- Loopback Test Equipment
- ServerNet Adapters and Related Components
- ServerNet/DA and Related Components
- CCSA and Related Components
- 6770 ServerNet Cluster and Related Components
- 6780 Switch and Related Components
- AWAN Servers and Related Components
- SWAN Concentrator and Related Components
- SWAN 2 Concentrator and Related Components
- Ethernet Switches and Hubs
- Modems and Modem Cable
- Universal Modem and Its AC Power Cords
- IOAM Products
- Cables and Cable Assemblies
- AC Power Cords, Enclosures Without Power Shelves
- AC Power Cords, Enclosures With Power Shelves
- B Specifications
- C Blank Forms
- D Case Study: ServerNet Cable Lengths
- E Guide to Server Manuals
- Manual Sets
- NonStop SSeries Server Manuals
- Availability Guides
- Adapter Manuals
- Configuration and Management Manuals
- Disk Manuals
- Generic Process Manuals
- Guardian Manuals
- Modular I/O Manuals
- Network Manuals
- SCF Manuals
- ServerNet Cluster Manuals
- Site Planning and Power Manual
- System Management Manual
- System Upgrade
- Tape Manuals
- OSM, TSM, System Console Manuals and Online Help
- Titles and Abstracts
- Manual Sets
- F Supported Hardware and Configurations
- G Modular Power Information
- Safety and Compliance
- Glossary
- Index

Glossary
HP NonStop S-Series Planning and Configuration Guide—523303-015
Glossary-48
ideogram
ideogram. See ideograph.
ideograph. A character or symbol representing a word or idea. Some writing systems, such
as Japanese and Chinese, use thousands of ideographs. An ideograph is sometimes
called an
ideogram.
IEC. International Electrotechnical Committee. IEC is a professional organization that
creates or adopts standards for computer hardware, environments, and physical
interconnections.
IEEE. Institute of Electrical and Electronics Engineers. IEEE is a professional organization
whose committees develop and propose computer standards that define the physical
and data link protocols of entities such as communication networks.
IEEE 802.3 protocol. Institute of Electrical and Electronics Engineers (IEEE) standard
defining the hardware layer and transport layer of (a variant of) Ethernet. The
maximum segment length is 500 meters, and the maximum total length is 2.5
kilometers. The maximum number of hosts is 1024. The maximum packet size is 1518
bytes.
impedance. The total opposition (that is, resistance and reactance) a circuit provides to the
flow of alternating current at a given frequency.
implementation-defined. Not specified by a standard. A correct value or behavior that is
implementation-defined can vary from system to system and therefore might represent
a feature or facility that cannot be ported.
implicit library. A library supplied by HP that is available in the read-only and execute-only
globally mapped address space shared by all processes without being specified to the
linker or loader. See also TNS system library
and public library.
implicit library import library (imp-imp). See import library.
implied user library. A method of binding TNS object files that have more than 16 code
segments. Segments 16 through 31 are located in the user code (UC) space but are
executed as if they were segments 0 through 15 of the user library (UL) code space.
This method precludes the use of a user library. Binder now supports 32 segments of
UC space concurrently with 32 segments of UL code space, so the implied user library
method is not needed in new or changed TNS applications.
import. To refer to a symbol definition from another loadfile. A loadfile imports a symbol
definition when it needs a data item or function having that symbolic name.
import control. The characteristic of a loadfile that determines from which other loadfiles it
can import symbol definitions. The programmer sets a loadfile’s import control at link
time. That import control can be localized, globalized, or semiglobalized. A loadfile’s
import control governs the way the linker and loader construct that loadfile’s searchList
and affects the search only for symbols required by that loadfile.