NonStop S-Series Planning and Configuration Guide (G06.25+)
Table Of Contents
- What’s New in This Guide
- About This Guide
- 1 Terms and Concepts
- NonStop S-Series Servers
- Enclosures
- Components
- Components, Processor Enclosure Without Power Shelf, Appearance Side
- Components, Processor Enclosure Without Power Shelf, Service Side
- Components, I/O Enclosure Without Power Shelf, Appearance Side
- Components, I/O Enclosure Without Power Shelf, Service Side
- Components, Processor Enclosure With Power Shelf, Appearance Side
- Components, Processor Enclosure With Power Shelf, Service Side
- Components, I/O Enclosure With Power Shelf, Appearance Side
- Components, I/O Enclosure With Power Shelf, Service Side
- Components in NonStop S76000, S86000, and Later Configurations
- Cluster Switch Enclosure
- IOAM Enclosure Components
- CRU Identification, System Enclosures
- FRU Identification, IOAM Enclosures
- CRUs and FRUs
- CRU/FRU Replacement Tools
- ServerNet Architecture
- Networking
- 2 The ServerNet Communications Network
- 3 Topologies
- 4 System Components
- Appearance Side of System Enclosures
- Service Side of System Enclosures
- Group ID Label
- Module ID Label
- Group Service LED
- SEBs and MSEBs
- Associated Fabrics
- Adapter Slots and Associated Fabrics
- ServerNet Adapters
- Filler Panels
- Slot Assignments for Slots 51 Through 54
- Emergency Power-Off (EPO) Connector
- Processor Multifunction (PMF) CRUs
- Configurations of Memory Units
- I/O Multifunction (IOMF) CRUs
- Enclosure Doors
- Tall Enclosure Door
- Enclosure Side Panel
- Plug-in Cards
- Typical PIC Installations
- System Console
- Tape Drives
- SWAN Concentrators
- External Disk Drives
- ServerNet Clusters
- IOAM Enclosures
- 5 ServerNet Cabling
- 6 ServerNet Communication Pathways
- 7 Enclosure Arrangements and Cable Connections
- 8 Initial Configurations
- Processor Numbers and Locations
- Processor Types and Memory Sizes
- Internal Disk Drives
- External Disk Drives
- Tape Drives
- Initial Default Values for System Attributes
- Initial Configuration Files
- Objects Configured in the Initial CONFIG File
- Objects That Must Not Be Renamed
- Command Files for Objects Not Configured in the Initial CONFIG File
- Files Used to Create the Initial CONFIG File
- CONFBASE File
- Naming Conventions Used in the SCF0000 File for SCF Objects
- SCF Commands to Automate Disk Configuration
- SWAN Concentrator Configurations
- Ethernet Ports on PMF CRUs and IOMF CRUs
- ServerNet Adapter Configurations
- Factory-Default Configuration of MFIOBs
- Initial IP Addresses for System and System Consoles
- IOAM Enclosures
- 9 The Planning and Configuration Process
- People and Functions
- The Installation Forms
- Preparing to Plan
- Installing a New System
- Changing an Existing System
- Changing the System Name or System Number
- Adding a System Enclosure
- Adding Memory to a Processor
- Adding a System Console
- Enclosure Interleaving for Storage Devices
- Configuring $SYSTEM Disk Slots
- Adding an Internal Disk Drive
- Changing the Configuration of a Disk Drive
- Adding a Tape Drive
- Changing the Configuration of a Tape Drive
- Adding a ServerNet Adapter
- Changing the System Configuration of a ServerNet Adapter
- Adding a SWAN or SWAN 2 Concentrator
- Changing the Configuration of a SWAN Concentrator
- Adding an AWAN Server
- Changing the Configuration of an AWAN Server
- Adding or Changing the WAN Subsystem
- Adding an Open SCSI Device
- Adding or Changing the Configuration of Other Peripheral Devices
- 10 Planning for System Availability and Support
- 11 Planning for LAN Communications
- 12 Site Planning and Preparation
- 13 Completing the Installation Plan
- Create the Installation Schedule
- Assemble the Installation Document Packet
- Installation Document Checklist
- System Equipment Inventory Form
- Enclosure Arrangement Diagram
- Floor Plan
- Preinstalled I/O Device Cable Checklist
- System Enclosure Checklist
- PMF CRU Configuration Forms
- IOMF CRU Configuration Forms
- ServerNet Adapter Configuration Forms
- ServerNet Cluster Configuration Form
- ServerNet Cabling Forms
- Cross-Row Cabling Worksheets
- IOAM Worksheets
- Final Planning Checklist
- Finish Planning
- 14 Planning for CRU Replacement
- 15 Planning for System Configuration
- A Part Numbers
- NonStop S-Series Enclosures
- System Components
- PMF CRUs
- Memory
- IOMF CRUs and Related Components
- SEBs and Related Components
- Doors, Racks, and Related Components
- Visual Image Package
- System Console and Related Components
- Internal Disk Drives
- External Magnetic Disk Drive and Related Components
- Tape Drives
- Tape Libraries
- 5190/94 Tape Drive and Related Components
- 5258 ACL Tabletop Tape Drive and Related Components
- 9840 Fibre Channel Tape Drive and Cables
- Linear Tape Open (LTO) Tape Drive and Related Components
- Loopback Test Equipment
- ServerNet Adapters and Related Components
- ServerNet/DA and Related Components
- CCSA and Related Components
- 6770 ServerNet Cluster and Related Components
- 6780 Switch and Related Components
- AWAN Servers and Related Components
- SWAN Concentrator and Related Components
- SWAN 2 Concentrator and Related Components
- Ethernet Switches and Hubs
- Modems and Modem Cable
- Universal Modem and Its AC Power Cords
- IOAM Products
- Cables and Cable Assemblies
- AC Power Cords, Enclosures Without Power Shelves
- AC Power Cords, Enclosures With Power Shelves
- B Specifications
- C Blank Forms
- D Case Study: ServerNet Cable Lengths
- E Guide to Server Manuals
- Manual Sets
- NonStop SSeries Server Manuals
- Availability Guides
- Adapter Manuals
- Configuration and Management Manuals
- Disk Manuals
- Generic Process Manuals
- Guardian Manuals
- Modular I/O Manuals
- Network Manuals
- SCF Manuals
- ServerNet Cluster Manuals
- Site Planning and Power Manual
- System Management Manual
- System Upgrade
- Tape Manuals
- OSM, TSM, System Console Manuals and Online Help
- Titles and Abstracts
- Manual Sets
- F Supported Hardware and Configurations
- G Modular Power Information
- Safety and Compliance
- Glossary
- Index

Glossary
HP NonStop S-Series Planning and Configuration Guide—523303-015
Glossary-117
Windows Internet Name Service (WINS)
Windows Internet Name Service (WINS). A name resolution service that resolves
Windows NT networking computer names to Internet protocol (IP) addresses in a
routed environment. A WINS server handles name registration, queries, and release
version updates (RVUs). See also IP address
.
WINS. See Windows Internet Name Service (WINS).
work files. Temporary files created during system generation that serve as storage areas.
Work files are useful for debugging purposes after system generation. You can choose
to make specified work files permanent.
working directory. In the Open System Services (OSS) environment, a directory,
associated with a process, that is used in pathname resolution for relative pathnames.
worldwide name (WWN). A unique, 64-bit number assigned to hardware ports.
WORM. See write once, read many (WORM).
wormhole routing. A technique for reducing network latency in a router. Packet bytes are
immediately switched to the appropriate output port as soon as they arrive rather than
accumulated in a buffer until an entire packet is received. Contrast with store and
forward routing.
write once, read many (WORM). A media storage class in which data, once written, cannot
be erased or overwritten.
WWN. See worldwide name (WWN).
WWN zones. Similar to Ethernet virtual LANs (VLANs), WWN zones organize the cabling
and interactions between components in a storage and server system.
wye. A polyphase electrical supply where the conductors of the source transformer are
connected to the terminals in a physical arrangement that resembles the letter
Y. Each
point of the Y represents the connection for a conductor at high potential. The angle of
phase displacement between each point on the Y is 120 degrees. The center point of
the Y is the common return point for the neutral conductor.
wye-delta. The interconnections between a wye source and a delta load.
X.21. A digital signaling interface recommended by the International Telecommunications
Union, Telecommunication Standardization Sector (ITU-T) that includes specifications
for data terminal equipment/data communications equipment (DTE/DCE) physical
interface elements, alignment of call control characters and error checking, elements of
the call control phase for circuit switched services, data transfer at or below 9600
bits/second, and test loops.
X fabric. The X side of the internal or external ServerNet fabrics. See also fabric, external
ServerNet X or Y fabric, and internal ServerNet X or Y fabric.