NonStop S-Series Planning and Configuration Guide (G06.26+)

Contents
HP NonStop S-Series Planning and Configuration Guide523303-017
xi
14. Planning for CRU Replacement
14. Planning for CRU Replacement
ServerNet Communication Pathways Worksheets 14-1
Completing the Worksheets 14-3
1. Highlight All System Enclosures 14-4
2. Black Out the CRU to Be Removed 14-5
3. Trace Unaffected Pathways 14-6
4. Draw a Line Around Affected Groups 14-7
15. Planning for System Configuration
Offline Configuration Tasks 15-1
Application Reconfiguration 15-1
Installing a New RVU 15-1
Installing a Product Revision 15-2
Changing the System Name, System Number, or Time Attributes 15-2
Changing the System Topology 15-2
Changing the CONFTEXT File 15-2
Online Configuration Tasks 15-3
Subsystem Control Facility (SCF) 15-3
Kernel-Managed Swap Facility (KMSF) 15-8
OSM Package 15-9
TSM Package 15-9
Creating an Alternate System Disk 15-10
Startup and Shutdown Files 15-10
Automating System Startup 15-10
Automating System Shutdown 15-11
Processes That Represent the System Console 15-11
CIIN File 15-11
Process Persistence 15-11
Adding Super-Group User IDs 15-12