NonStop S-Series Planning and Configuration Guide (G06.29+)

Topologies
HP NonStop S-Series Planning and Configuration Guide523303-021
3-10
Topology Configuration Considerations
IOAM Enclosure
Group I/O Enclosure Groups Not Allowed for G06.26 RVUs
11 21, 31, 41
12 22, 32, 42
13 23, 33, 43
14 24, 34, 44
15 25, 35, 45
Caution. IOAM enclosures must be installed and cabled by HP trained service providers.
Information is available to your HP trained service provider in the Modular I/O Installation and
Configuration Guide.