12. Site Planning and Preparation (continued)
12. Site Planning and Preparation (continued)
Uninterruptible Power Supplies (UPSs) 12-8
Ethernet Switches or Hubs 12-9
System Enclosures 12-9
IOAM Enclosures 12-9
Peripheral Devices 12-9
AC Power Cords 12-9
Meeting the Environmental Requirements 12-10
Computer-Room Construction 12-10
Temperature and Humidity 12-10
Fire and Safety Precautions 12-11
Emergency Power-Off (EPO) Equipment 12-11
Electrostatic Discharge (ESD) Control and Protection 12-12
Other Factors 12-13
Preparing the Delivery Route 12-13
13. Completing the Installation Plan
Create the Installation Schedule 13-1
Assemble the Installation Document Packet 13-2
Installation Document Checklist 13-3
System Equipment Inventory Form 13-5
Enclosure Arrangement Diagram 13-7
Floor Plan 13-9
Preinstalled I/O Device Cable Checklist 13-11
System Enclosure Checklist 13-13
PMF CRU Configuration Forms 13-16
IOMF CRU Configuration Forms 13-20
ServerNet Adapter Configuration Forms 13-22
ServerNet Cluster Configuration Form 13-22
ServerNet Cabling Forms 13-23
Cross-Row Cabling Worksheets 13-25
IOAM Worksheets 13-26
Final Planning Checklist 13-27
Finish Planning 13-28
14. Planning for CRU Replacement
ServerNet Communication Pathways Worksheets 14-1
Completing the Worksheets 14-3
1. Highlight All System Enclosures 14-4