NonStop S-Series Planning and Configuration Guide (G06.29+)

HP NonStop S-Series Planning and Configuration Guide523303-021
Part II. Planning Tasks
This part provides information about planning and preparing your site for the
installation of NonStop S-series system hardware.
Section Title Abstract
9
The Planning and
Configuration Process
This section provides overviews of the process of
installing a new system and the process of making
hardware or software changes to an existing
system.
10
Planning for System
Availability and Support
This section describes advance planning required
for minimizing the total number of minutes that an
application or system is unavailable.
11
Planning for LAN
Communications
This section describes requirements and
considerations for configuring local area networks
(LANs) for NonStop S-series servers.
12
Site Planning and
Preparation
This section provides information you need to plan
and prepare the site for a NonStop S-series system.
13
Completing the Installation
Plan
This section describes how to finish the planning
tasks, including assembling the Installation
Document Packet.
14
Planning for CRU
Replacement
This section describes how to plan for CRU
replacement by completing the ServerNet
communication pathways worksheets.
15
Planning for System
Configuration
This section describes factors to consider when you
plan the installation or reconfiguration of a system.